Category:East Side Access construction/2019/12/13
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/12/13"
The following 22 files are in this category, out of 22 total.
-
Installing an escalator track in the future LIRR terminal. (49214802647).jpg 4,032 × 3,024; 3.2 MB
-
Installing the wall frame in the tunnel of the future LIRR terminal. (49214573351).jpg 4,032 × 3,024; 3.14 MB
-
Laying out and terminating pulled cables in a control room area in Queens. (49214091098).jpg 4,608 × 3,456; 3.32 MB
-
Laying out panel installation for a substation in Queens. (49214573171).jpg 3,645 × 3,456; 6.72 MB
-
Placing concrete for the final approach structure in Harold Interlocking. (49214802402).jpg 1,512 × 2,016; 1.02 MB
-
Relocating construction materials at the future Mid-Day Storage Yard. (49214801742).jpg 3,514 × 1,977; 1.9 MB