File:View of transformers on roof; looking southeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, HAER WASH,27-DIER,1-98.tif

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (5,000 × 3,625 pixels, file size: 17.29 MB, MIME type: image/tiff)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
View of transformers on roof; looking southeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
Photographer
Lowe, Jet, creator
Title
View of transformers on roof; looking southeast. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
Description
Shuffletin, Samuel L; Stine, Charles; Webster, Edwin; Baker, Charles H
Depicted place Washington; Pierce County; Dieringer
Date Documentation compiled after 1968
Dimensions height: 5 in (12.7 cm); width: 7 in (17.7 cm)
dimensions QS:P2048,5U218593
dimensions QS:P2049,7U218593
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER WASH,27-DIER,1-98
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: A combination run-of-the-river and large-storage hydroelectric operation, the White River Hydroelectric Project, when completed in 1911, served as the controlling works in western Washington's largest hydroelectric system. It was designed and constructed by the Pacific Coast Power Company, a subsidiary of the Boston-based firm of Stone and Webster.
  • Unprocessed Field note material exists for this structure: N179
  • Survey number: HAER WA-64
  • Building/structure dates: 1911 Initial Construction
Source https://www.loc.gov/pictures/item/wa0374.photos.370165p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current20:39, 4 August 2014Thumbnail for version as of 20:39, 4 August 20145,000 × 3,625 (17.29 MB) (talk | contribs)GWToolset: Creating mediafile for Fæ. HABS 2014-08-04 (3601:3800) Penultimate Tranche!

Metadata