File:VIEW OF BASEMENT UNDER EAST BOILER ROOM LOOKING TOWARD WEST BOILER ROOM BASEMENT THROUGH THE ASH TRANSFER TUNNEL. ASH HOPPER FOR BOILER 900 IS ON THE RIGHT. NOTE THE TRACKS HAER CONN,1-GREWI,15A-33.tif
Jump to navigation
Jump to search
![File:VIEW OF BASEMENT UNDER EAST BOILER ROOM LOOKING TOWARD WEST BOILER ROOM BASEMENT THROUGH THE ASH TRANSFER TUNNEL. ASH HOPPER FOR BOILER 900 IS ON THE RIGHT. NOTE THE TRACKS HAER CONN,1-GREWI,15A-33.tif](https://upload.wikimedia.org/wikipedia/commons/thumb/2/27/VIEW_OF_BASEMENT_UNDER_EAST_BOILER_ROOM_LOOKING_TOWARD_WEST_BOILER_ROOM_BASEMENT_THROUGH_THE_ASH_TRANSFER_TUNNEL._ASH_HOPPER_FOR_BOILER_900_IS_ON_THE_RIGHT._NOTE_THE_TRACKS_HAER_CONN%2C1-GREWI%2C15A-33.tif/lossy-page1-800px-thumbnail.tif.jpg?20140708162454)
Size of this JPG preview of this TIF file: 800 × 573 pixels. Other resolutions: 320 × 229 pixels | 640 × 458 pixels | 1,024 × 733 pixels | 1,280 × 917 pixels | 2,560 × 1,833 pixels | 5,692 × 4,076 pixels.
Original file (5,692 × 4,076 pixels, file size: 22.13 MB, MIME type: image/tiff)