File:Scammonden Dam - geograph.org.uk - 692836.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Scammonden_Dam_-_geograph.org.uk_-_692836.jpg(640 × 427 pixels, file size: 86 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Scammonden Dam The dam was completed in 1971 as part of the contract for the construction of the Pennine section of the M62 motorway. It consist of 4.5 million cubic yards of rockfill, with a clay core. The clay was imported from the Gildersome to Lofthouse Section of the M62. The dam was officially opened by Her Majesty the Queen on the 14th October 1971. Further information can be found on http://www.ukmotorwayarchive.org/ in the section for the West Riding of Yorkshire, M62.Boundary to Pole Moor.
Date
Source From geograph.org.uk
Author Richard Kay
Attribution
(required by the license)
InfoField
Richard Kay / Scammonden Dam / 
Richard Kay / Scammonden Dam
Camera location53° 38′ 40″ N, 1° 55′ 05″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 38′ 49″ N, 1° 55′ 19″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Richard Kay
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:58, 8 February 2011Thumbnail for version as of 05:58, 8 February 2011640 × 427 (86 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Scammonden Dam The dam was completed in 1971 as part of the contract for the construction of the Pennine section of the M62 motorway. It consist of 4.5 million cubic yards of rockfill, with a clay c

There are no pages that use this file.

Metadata