File:KSC-04-S-00212 (ksc 070204 auratp2).webm
KSC-04-S-00212_(ksc_070204_auratp2).webm (WebM audio/video file, VP9/Opus, length 58 s, 320 × 212 pixels, 301 kbps overall, file size: 2.09 MB)
Captions
Summary
[edit]DescriptionKSC-04-S-00212 (ksc 070204 auratp2).webm |
English: The final countdown to the Aura Launch is now underway. The spacecraft was driven out to the pad and lifted to the top of its Delta II rocket on June 22. It’s called lift and mate, and it's a pretty delicate process. The spacecraft is packed with cutting edge scientific equipment to look at the Earth's atmosphere, so workers are extremely careful in making sure that the lifting operation runs very smoothly. Aura's lift and mate went off without a hitch, and now the satellite is ready to go into orbit on July 10. There's a few last minute tests that are taking place, but so far Aura is in excellent shape and ready to launch. You can keep up to date on the latest status of the Aura launch by visiting www.nasa.gov. While you're there, log on to NASA Direct_ for a preview of NASA's live Aura webcast. . |
||
Date | Taken on 7 July 2004 | ||
Source |
|
||
Author | NASA Kennedy Space Center | ||
Keywords InfoField | countdown; delta; earth_atmosphere; launching; aura |
Licensing
[edit]Public domainPublic domainfalsefalse |
This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.) | ||
Warnings:
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:44, 10 May 2024 | 58 s, 320 × 212 (2.09 MB) | OptimusPrimeBot (talk | contribs) | Imported media from http://images-assets.nasa.gov/video/ksc_070204_auratp2/ksc_070204_auratp2~orig.mp4 |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Transcode status
Update transcode statusFormat | Bitrate | Download | Status | Encode time |
---|---|---|---|---|
VP9 240P | 205 kbps | Completed 02:01, 10 May 2024 | 16 s | |
WebM 360P | 422 kbps | Completed 02:01, 10 May 2024 | 7.0 s | |
QuickTime 144p (MJPEG) | Not ready | Unknown status |
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Short title | Aura Lift and Mate Complete, Ready for Launch 07-05-04 |
---|---|
Copyright holder | 2004 |
Software used |