File:INTERIOR VIEW OF TANK CHARGING ROOM ON LEVEL 4; NOTE HERRINGBONE-PATTERNED BRICK FLOOR; TIMBER SUBSTRUCTURE CARRIED CRANE USED TO REMOVE HEAVY TANK COVERS; WINDOWS IN ROOFTOP HAER IOWA,7-WATLO,4G-1.tif
Jump to navigation
Jump to search
![File:INTERIOR VIEW OF TANK CHARGING ROOM ON LEVEL 4; NOTE HERRINGBONE-PATTERNED BRICK FLOOR; TIMBER SUBSTRUCTURE CARRIED CRANE USED TO REMOVE HEAVY TANK COVERS; WINDOWS IN ROOFTOP HAER IOWA,7-WATLO,4G-1.tif](https://upload.wikimedia.org/wikipedia/commons/thumb/5/59/INTERIOR_VIEW_OF_TANK_CHARGING_ROOM_ON_LEVEL_4%3B_NOTE_HERRINGBONE-PATTERNED_BRICK_FLOOR%3B_TIMBER_SUBSTRUCTURE_CARRIED_CRANE_USED_TO_REMOVE_HEAVY_TANK_COVERS%3B_WINDOWS_IN_ROOFTOP_HAER_IOWA%2C7-WATLO%2C4G-1.tif/lossy-page1-739px-thumbnail.tif.jpg?20140714150222)
Size of this JPG preview of this TIF file: 739 × 600 pixels. Other resolutions: 296 × 240 pixels | 591 × 480 pixels | 946 × 768 pixels | 1,262 × 1,024 pixels | 2,523 × 2,048 pixels | 5,000 × 4,059 pixels.
Original file (5,000 × 4,059 pixels, file size: 19.36 MB, MIME type: image/tiff)