File:DETAIL VIEW OF ENTRANCE PYLON - Crooked River High Bridge, Spanning Crooked River Gorge at Dalles-California Highway, Terrebonne, Deschutes County, OR HAER ORE,9-TERBO.V,1-15.tif

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(5,000 × 3,992 pixels, file size: 19.04 MB, MIME type: image/tiff)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
DETAIL VIEW OF ENTRANCE PYLON - Crooked River High Bridge, Spanning Crooked River Gorge at Dalles-California Highway, Terrebonne, Deschutes County, OR
Photographer

Related names:

Bennett, transmitter
Title
DETAIL VIEW OF ENTRANCE PYLON - Crooked River High Bridge, Spanning Crooked River Gorge at Dalles-California Highway, Terrebonne, Deschutes County, OR
Depicted place Oregon; Deschutes County; Terrebonne
Date Documentation compiled after 1968
Dimensions 4 x 5 in.
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER ORE,9-TERBO.V,1-15
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: Crooked River High Bridge was completed in 1926 as part of the Dalles-California Highway (U.S. 97). It was designed by State Bridge Engineer Conde B. McCullough. The bridge is a single-span steel deck arch that is 464' long and 27' wide. The main span is 330' long and consists of a double-hinged braced spandrel deck arch. Hinge pins were provided at both crown and skewbacks. The structure was designed to act under dead load as a three-hinged arch and under live load as an arch with skewback hinges only. There are 134 feet of reinforced concrete approach spans. The railing is constructed of precast concrete arches, with a cast in place cap. The structure was one of the highest bridges in the United States, at 295' from deck to streambed, when it was constructed. A high line cableway was used in the erection of the structure, rather than a traveling derrick or hoist.
  • Unprocessed Field note material exists for this structure: FN-19
  • Survey number: HAER OR-35
Source https://www.loc.gov/pictures/item/or0302.photos.354422p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.
Object location44° 21′ 11.02″ N, 121° 10′ 36.01″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:49, 2 August 2014Thumbnail for version as of 06:49, 2 August 20145,000 × 3,992 (19.04 MB) (talk | contribs)GWToolset: Creating mediafile for Fæ. HABS 2014-08-01 2601-2900 missing

Metadata