File:Completed Crossing and Dismantling of the Detour Bridge OR (8474600984).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Completed_Crossing_and_Dismantling_of_the_Detour_Bridge_OR_(8474600984).jpg(478 × 360 pixels, file size: 77 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description At the end of the 6-week single-lane detour, the new bridge was opened to traffic in both directions and the detour bridge was dismantled and removed as part of an FHWA, Highways for LIFE project with ODOT using alternate project delivery and innovative ABC to rapidly remove and replace five bridges. No incidents were reported during the traffic control operation.
Date
Source Completed Crossing and Dismantling of the Detour Bridge_OR
Author Federal Highway Administration

Licensing

[edit]
This image was originally posted to Flickr by Federal Highway Administration (FHWA) at https://flickr.com/photos/64293484@N05/8474600984 (archive). It was reviewed on 17 August 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

17 August 2018

Public domain This image is a work of a United States Department of Transportation employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

English  Español  日本語  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:32, 17 August 2018Thumbnail for version as of 16:32, 17 August 2018478 × 360 (77 KB)Tyler ser Noche (talk | contribs)Transferred from Flickr via #flickr2commons

There are no pages that use this file.

Metadata