Category:Oregon Demonstration Project: Alternate Project Delivery and Accelerated Bridge Construction (ABC) on OR 38, Drain to Elkton
Jump to navigation
Jump to search
Media in category "Oregon Demonstration Project: Alternate Project Delivery and Accelerated Bridge Construction (ABC) on OR 38, Drain to Elkton"
The following 7 files are in this category, out of 7 total.
-
Demolition and Dismantling of End Panels OR (8473513401).jpg 573 × 417; 110 KB
-
Hydraulic Sliding System OR (8473513339).jpg 512 × 387; 138 KB
-
ODOT-FHWA Workshop OR (8474601216).jpg 611 × 407; 121 KB
-
Old and New Superstructures Side-By Side OR (8473513467).jpg 572 × 430; 133 KB
-
Old bridge over Elk Creek Near Elkton OR (8473513595).jpg 511 × 344; 117 KB
-
Temporary Bridge Along Side of Old Bridge OR (8473513289).jpg 475 × 358; 89 KB