Category:US National Archives series: Federal Aid Project Files, compiled 1919 - 1955
No.
File
Categorized?
1
Looking south from north bank. At 9 am, Feb. 20, 1927, one hour after Pier "C" shirfted. Six trestle bents washed out... - NARA - 298243.tif
Done
2
Placing connection of suspension cables to northwest main anchor. showing front log, rods, sling chains and plate... - NARA - 298244.tif
Done
3
Hauling rock from the river bank to the cribbing at Tower C - NARA - 298245.tif
Done
4
Image shows the force fo the high water on the corrugated sheet iron encasement of Tower C. The pressure was... - NARA - 298246.tif
Done
5
Reinforcements placed on northwest main anchor. Showing front log, rods, and bearing plates. Note washout in front of... - NARA - 298247.tif
Done
6
Concrete foundation of southeast leg Tower C, indicating damage to end of post. - NARA - 298248.tif
7
Placing fill and slope boards for protection of northwest main anchor. - NARA - 298249.tif
Done
8
Excavation on southeast leg Tower C. Shoring is required in all excavation more than 6 feet deep. - NARA - 298250.tif
Done
9
The crew, Marshall Fry, Claude Fry, Mose Fry, L.D. Blondell, Wm. Reives, E.E. Dunbar, Gene Fry, W.T. Reinhards, Jean... - NARA - 298251.tif
Done
10
Looking northwest from south bank. Remaining north approach shows relative shift downstream of Pier "C". Water just... - NARA - 298242.tif
Done
11
Forest Service Footbridge at Angess - NARA - 298252.tif
Done
12
End of project station 245, Section 11. Connects with trestle to Waldport, Oregon. Dangerous crossing of logging road. - NARA - 298259.tif
Done
13
Alsea Rier Crossing Station 60, Sec. 9 1-150 ft. Housed Howe truss and 1-50 ft. Housed pony Truss. Highwater line at... - NARA - 298257.tif
Done
14
Widening fill Station 150 on Section 11. THis fill crosses Eckman Slough and photo taken about half tide. Note... - NARA - 298258.tif
Done
15
Alsea River Bridge, Station 60, Section 9. Looking through spans from South end. Shows stiff construction and well... - NARA - 298255.tif
Done
16
Station 135 - Sec. 11. Small revolving shovel loading into trucks for Eckman Slough Fill. Was very expensive piece of... - NARA - 298254.tif
17
Station 150 - Section 11. Echman Slough showing brush mat used under fills crossing soft mud tide flats. - NARA - 298256.tif
18
Looking south from north bank. At 9 am, Feb. 20, 1927, one hour after Pier "C" shirfted. Six trestle bents washed out... - NARA - 298243.jpg
Done
19
Placing connection of suspension cables to northwest main anchor. showing front log, rods, sling chains and plate... - NARA - 298244.jpg
Done
20
Hauling rock from the river bank to the cribbing at Tower C - NARA - 298245.jpg
Done
21
Image shows the force fo the high water on the corrugated sheet iron encasement of Tower C. The pressure was... - NARA - 298246.jpg
22
Reinforcements placed on northwest main anchor. Showing front log, rods, and bearing plates. Note washout in front of... - NARA - 298247.jpg
23
Concrete foundation of southeast leg Tower C, indicating damage to end of post. - NARA - 298248.jpg
24
Placing fill and slope boards for protection of northwest main anchor. - NARA - 298249.jpg
25
Excavation on southeast leg Tower C. Shoring is required in all excavation more than 6 feet deep. - NARA - 298250.jpg
26
The crew, Marshall Fry, Claude Fry, Mose Fry, L.D. Blondell, Wm. Reives, E.E. Dunbar, Gene Fry, W.T. Reinhards, Jean... - NARA - 298251.jpg
Done
27
Looking northwest from south bank. Remaining north approach shows relative shift downstream of Pier "C". Water just... - NARA - 298242.jpg
Done
28
Forest Service Footbridge at Angess - NARA - 298252.jpg
Done
29
End of project station 245, Section 11. Connects with trestle to Waldport, Oregon. Dangerous crossing of logging road. - NARA - 298259.jpg
30
Alsea Rier Crossing Station 60, Sec. 9 1-150 ft. Housed Howe truss and 1-50 ft. Housed pony Truss. Highwater line at... - NARA - 298257.jpg
Done
31
Widening fill Station 150 on Section 11. THis fill crosses Eckman Slough and photo taken about half tide. Note... - NARA - 298258.jpg
Done
32
Alsea River Bridge, Station 60, Section 9. Looking through spans from South end. Shows stiff construction and well... - NARA - 298255.jpg
33
Station 135 - Sec. 11. Small revolving shovel loading into trucks for Eckman Slough Fill. Was very expensive piece of... - NARA - 298254.jpg
34
Station 150 - Section 11. Echman Slough showing brush mat used under fills crossing soft mud tide flats. - NARA - 298256.jpg