Category:Wormington-Sapperton gas pipeline
Jump to navigation
Jump to search
English: The Wormington–Sapperton gas pipeline is a ca. 44 km long, high-pressure (70 or 75 bar) natural gas pipeline in Gloucestershire, England. It was built in 2010 (contracting authority: National Grid plc) and connects the compressor station at Wormington with the station at Sapperton. Pipeline diameter: 900 mm.
Media in category "Wormington-Sapperton gas pipeline"
The following 51 files are in this category, out of 51 total.
-
DSCF2358 (6515837813).jpg 1,024 × 768; 386 KB
-
EXCAVATOR (6515873781) (2).jpg 996 × 770; 406 KB
-
Pipeline under construction (6515850717).jpg 1,024 × 768; 543 KB
-
Pipelines under construction (6515839207).jpg 1,024 × 768; 358 KB
-
Pipelines under construction (6515840709).jpg 768 × 1,024; 442 KB
-
Pipelines under construction (6515842017).jpg 1,024 × 768; 351 KB
-
Pipelines under construction (6515842567).jpg 768 × 1,024; 368 KB
-
Pipelines under construction (6515843063).jpg 768 × 1,024; 373 KB
-
Pipelines under construction (6515843941).jpg 768 × 1,024; 564 KB
-
Pipelines under construction (6515844403).jpg 768 × 1,024; 371 KB
-
Pipelines under construction (6515845923).jpg 768 × 1,024; 487 KB
-
Pipelines under construction (6515846109) (2).jpg 1,024 × 768; 382 KB
-
Pipelines under construction (6515847727).jpg 683 × 1,024; 354 KB
-
Pipelines under construction (6515848457).jpg 1,024 × 768; 683 KB
-
Pipelines under construction (6515849563).jpg 1,024 × 768; 671 KB
-
Pipelines under construction (6515850143).jpg 1,024 × 768; 637 KB
-
W-S 025 electric bunting (6515851181) (2).jpg 1,024 × 683; 411 KB
-
W-S 029 section 27 (6515851673).jpg 1,024 × 683; 507 KB
-
W-S 031 section 24 (6515852171).jpg 683 × 1,024; 485 KB
-
W-S 033 section 24 (6515852707).jpg 1,024 × 683; 551 KB
-
W-S 035 section 23 (6515853249).jpg 1,024 × 683; 508 KB
-
W-S 041 section 23 (6515853753).jpg 683 × 1,024; 577 KB
-
W-S 057 stringing pipe (6515854293).jpg 1,024 × 683; 646 KB
-
W-S 068 stringing pipe (6515854879) (2).jpg 683 × 1,024; 367 KB
-
W-S 070 stringing pipe (6515855605).jpg 1,024 × 683; 596 KB
-
W-S 092 section 20 (6515856169) (2).jpg 1,024 × 683; 545 KB
-
W-S 101 pipe bend (6515856889).jpg 1,024 × 683; 619 KB
-
W-S 118 pipe yard (6515857519).jpg 1,024 × 683; 448 KB
-
W-S 119 pipe yard (6515858129).jpg 1,024 × 683; 433 KB
-
W-S 121 pipe yard (6515859047).jpg 1,024 × 683; 410 KB
-
W-S 123 pipe yard (6515859639) (2).jpg 1,024 × 683; 395 KB
-
W-S 125 pipe yard (6515860179).jpg 1,024 × 683; 412 KB
-
W-S 137 trenching section 11 (6515860923).jpg 683 × 1,024; 695 KB
-
W-S 139 trenching section 11 (6515861815).jpg 1,024 × 683; 814 KB
-
W-S 142 trenching section 11 (6515862685).jpg 1,024 × 683; 569 KB
-
W-S 157 AUT inspection (6515863213).jpg 1,024 × 683; 474 KB
-
W-S 159 AUT inspection (6515863859) (2).jpg 683 × 1,024; 527 KB
-
W-S 161 manual weld (6515864613).jpg 1,024 × 683; 462 KB
-
W-S 163 manual weld (6515865171).jpg 1,024 × 683; 571 KB
-
W-S 170 HDD 1 (6515865911).jpg 1,024 × 683; 610 KB
-
W-S 175 HDD 1 (6515866703).jpg 683 × 1,024; 661 KB
-
W-S 194 augerbore RDX6 (6515867561) (2).jpg 1,024 × 683; 706 KB
-
W-S 205 auger backfill (6515868885) (2).jpg 1,024 × 683; 684 KB
-
W-S 209 auger backfill (6515869297) (2).jpg 1,024 × 683; 318 KB
-
W-S 212 grit blast coat (6515869861).jpg 683 × 1,024; 363 KB
-
W-S 216 grit blast coat (6515870501).jpg 683 × 1,024; 377 KB
-
W-S 221 grit blast coat (6515870935).jpg 683 × 1,024; 387 KB
-
W-S 225 grit blast coat (6515871471).jpg 683 × 1,024; 333 KB
-
W-S 233 site compound (6515872151).jpg 1,024 × 683; 572 KB
-
W-S 246 section 24 (6515872799).jpg 1,024 × 683; 473 KB
-
W-S 252 weld rapeseed (6515873427).jpg 1,024 × 683; 525 KB