Category:Worcester Main Line and Massachusetts Turnpike
Jump to navigation
Jump to search
English: In 1958, the Boston & Albany mainline east of Route 128 was sold to the Massachusetts Turnpike Authority to allow the construction of the Massachusetts Turnpike Extension. In 1961, the third and fourth tracks were removed, and construction began. The Turnpike opened to Beacon Park (Allston) in 1964 and downtown Boston in 1965. Today, the two-track mainline runs parallel to the Turnpike, with several stops adjacent to the highway.
Subcategories
This category has the following 8 subcategories, out of 8 total.
Media in category "Worcester Main Line and Massachusetts Turnpike"
The following 33 files are in this category, out of 33 total.
-
2009 BackBay Boston 3439905009.jpg 680 × 1,024; 421 KB
-
2009 BoylstonSt aerial Boston 3275114171.jpg 1,024 × 680; 380 KB
-
2009 BoylstonSt aerial Boston 3472213719.jpg 1,823 × 1,823; 1.15 MB
-
Allston Depot from above 2018.agr.jpg 4,032 × 3,024; 8.06 MB
-
Allston Depot from above.JPG 4,146 × 3,047; 2.68 MB
-
Back Bay Station from Berkeley St Oct 24 2024.jpg 3,525 × 2,643; 3.47 MB
-
Beacon Park Yard western approach 2018.agr.jpg 4,032 × 3,024; 8.7 MB
-
BU Central Campus panorama from Photonics.jpg 10,927 × 3,899; 11.61 MB
-
Fenway neighborhood seen from Prudential Skywalk.jpg 3,240 × 4,320; 4.3 MB
-
Inland Regional and Mass Pike on 17 March 2013.JPG 3,915 × 2,868; 1.81 MB
-
LSL outbound by Mass Pike.JPG 3,386 × 2,544; 2.08 MB
-
Mass Pike at Newton.jpg 1,600 × 1,200; 703 KB
-
Mass Pike at night from Carlton Street, Boston.jpg 800 × 600; 182 KB
-
MBTA locomotives running light near Back Bay, August 2011.jpg 1,294 × 1,941; 596 KB
-
NYCRR Headlights Cover 196502XX.png 1,600 × 2,132; 9.29 MB
-
Orange Line portal near Back Bay, March 2017.jpg 4,400 × 2,937; 4.1 MB
-
Proposed Back Bay portal location for North-South Rail Link, March 2017.JPG 4,320 × 3,240; 2.58 MB
-
Road-rail with toilet trailer.agr.jpg 1,418 × 1,892; 637 KB
-
Shaw's over the Massachusetts Turnpike, Newtonville MA.jpg 2,492 × 1,660; 637 KB
-
SW From Boston downtown.jpg 3,366 × 2,208; 997 KB
-
Temporary track crossing for Parcel 12 construction, December 2021.JPG 5,184 × 3,888; 8.59 MB
-
Trains passing at Yawkey.JPG 3,996 × 2,719; 2.15 MB
-
View of Interstate 90 from Charlesgate in Boston.jpg 3,264 × 2,448; 2.47 MB
-
View west from Prudential Tower, July 2015.jpg 7,770 × 5,081; 8.43 MB
-
West end of Prudential Center rail tunnel, December 2022.JPG 5,184 × 3,888; 9.18 MB
-
Westbound Framingham Worcester train in Boston Oct 2024.jpg 8,087 × 5,392; 23.46 MB
-
Westbound Framingham Worcester train past Boston Landing 2.jpg 8,256 × 5,504; 25.44 MB
-
Westbound Framingham Worcester train past Boston Landing 3.jpg 8,256 × 5,504; 23.83 MB
-
Westbound Framingham Worcester train past Boston Landing.jpg 8,256 × 5,504; 27.12 MB
-
Westbound Lake Shore Limited in Boston Oct 2024.jpg 8,006 × 5,338; 22.81 MB
-
Worcester Line train at St Marys Street.JPG 4,121 × 2,218; 1.29 MB
-
Worcester Line train passing through Allston.JPG 4,320 × 3,240; 3.47 MB
-
Worcester train, Mass Pike, and Newbury Street.jpg 3,492 × 2,247; 1.79 MB