Help
Category
:
Wachusett–Coldbrook Tunnel
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Media in category "Wachusett–Coldbrook Tunnel"
The following 200 files are in this category, out of 241 total.
(previous page) (
next page
)
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, abandoned filter bed, Shaft 2, Holden, Mass., Aug. 31, 1931 - DPLA - 607ba613da04835862b1373e816b5429.jpg
800 × 509; 71 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, abandoned filter bed, Shaft 2, Holden, Mass., Aug. 31, 1931 - DPLA - 8ad72b76741f4468e0cad9237ce12b92.jpg
800 × 514; 77 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, aggregate piles and crusher from muck pile, Shaft 2, Holden, Mass., Dec. 1, 1930 - DPLA - 3a916d753b4ed759a18b199a0bd21fda.jpg
800 × 507; 71 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, bronze guard chains, railing, etc., bottom of Shaft 1, West Boylston, Mass., Feb. 2, 1931 - DPLA - ccbc4417bff9f20677b53af28d7d5982.jpg
800 × 504; 63 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, car dumping into concrete mixer, Shaft 2, Sta. 161+50, Holden, Mass., Nov. 4, 1930 - DPLA - 63540a1e5a66ca62c8f784efb640022a.jpg
800 × 505; 71 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, car lifter, Shaft 3, Holden, Mass., May 5, 1930 - DPLA - 761c2a69109f3d6b2ff421cccda22d4b.jpg
800 × 508; 73 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, concrete gun and mixer, Shaft 2, Sta. 162+00, Holden, Mass., Nov. 4, 1930 - DPLA - defff56c955213b3a952ecc3bb6d33d9.jpg
800 × 517; 82 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, concrete mixer being assembled at Shaft 2, Holden, Mass., Dec. 1, 1930 - DPLA - 4ee3b8deda47a63db09cc895b9ce1178.jpg
800 × 522; 78 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, crusher and aggregate piles, Shaft 2, Holden, Mass., Dec. 1, 1930 - DPLA - 4c3365db48ed2590423fcdef5fd8d1c0.jpg
800 × 506; 72 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, dragline cuts in muck pile, Shaft 2, Holden, Mass., Dec. 1, 1930 - DPLA - 06064a34af3d11bc92b9488e2a17cbb8.jpg
800 × 508; 79 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, finished concrete, sidewalls and arch, Shaft 2, Sta. 168+00, Holden, Mass., Nov. 4, 1930 - DPLA - 8f6296f85b1da4501d85939bd113913a.jpg
800 × 506; 66 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, finished tunnel concrete, bottom of Shaft 2, looking west, final work of laying invert in - DPLA - 0a346c7a1cc3f8dc192543fc62fcb683.jpg
800 × 501; 73 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, guard rail on shaft cover and grading around Shaft 2, Holden, Mass., Aug. 31, 1931 - DPLA - dca09a8377eca203c6beab66d09ee7c8.jpg
800 × 504; 75 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, head house foundation, Shaft 4, Rutland, Mass., Aug. 31, 1931 - DPLA - 5b6499279de5d91dc4ccee13a7ebd846.jpg
800 × 508; 109 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 1 to 2 looking west, Sta. 29+34, West Boylston, Mass., Jun. 15, 1930 - DPLA - e21e0e14d68aa570e8099115e3366e0c.jpg
800 × 507; 90 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 2 to 1 looking east, Sta. 29+34, Holden, Mass., Jun. 15, 1930 - DPLA - 5d92b50494ffb62cd52e471dbd53ed67.jpg
800 × 506; 87 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, interbedded quartzite and phyllite, north shore Wachusett Reservoir, Clinton, Mass., Mar. - DPLA - 9c328d545bf1fc32729f59091845a47f.jpg
800 × 505; 92 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, jumbo drill carriage used at Shafts 2 and 4, Holden, Mass., Jun. 15, 1930 - DPLA - 1622324c8fd64f36dcb99aaa2fe1d839.jpg
800 × 505; 78 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, loaded muck cars, bottom of Shaft 2, Holden, Mass., May 5, 1930 - DPLA - 8b140da83995bb9d3bc8844bdadb9d35.jpg
800 × 514; 103 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, loading cars with dry concrete, bottom of Shaft 2, Holden, Mass., Nov. 4, 1930 - DPLA - 3066b7cf8d0168cd074cbca84db0e6d9.jpg
800 × 503; 75 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, M.D.W.S. bench mark and shaft marker, bottom of Shaft 1, West Boylston, Mass., Feb. 2, 193 - DPLA - 7910f166e545e6dc3ca328d2f7a013e2.jpg
800 × 508; 67 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, outlets in outlet shaft lining, Shaft 1, West Boylston, Mass., May 5, 1930 - DPLA - c8a98ca46eddce81586a1a7713ed68af.jpg
800 × 507; 81 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, south bank of outlet at Shaft 1, West Boylston, Mass., Nov. 3, 1930 - DPLA - 2ce9def4be2c455c83440ba5a18f0cb7.jpg
800 × 524; 79 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, steel forms for concrete, Shaft 2, Sta. 164+00, Holden, Mass., Nov. 4, 1930 - DPLA - d86b3a17b72ce9b6808c0bd4a81f9d70.jpg
800 × 501; 80 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, stripped form on jumbo, Shaft 2, Sta. 166+00, Holden, Mass., Nov. 4, 1930 - DPLA - 73dd950467f77d9a17f8c1ccd33b87d5.jpg
800 × 503; 65 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering in tunnel, Shaft 3, Sta. 207+80+--, Holden, Mass., May 5, 1930 - DPLA - 24c0af6503c58cb4dd23cca12c38acc7.jpg
800 × 509; 67 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering in tunnel, Shaft 3, Sta. 209+00+--, Holden, Mass., May 5, 1930 - DPLA - 5280cded19d8cfeba1a7642b8bd1a8ae.jpg
800 × 506; 103 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering, dynamite car and pump, Shaft 3, Sta. 217+00+--, Holden, Mass., May 5, 1930 - DPLA - 2b96717a3190b2473893650e77c90b0d.jpg
800 × 505; 90 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section Shaft 1 looking west, Sta. 26+24+--, West Boylston, Mass., Jun. 15, 193 - DPLA - 674d120651c573f9b14683e8f1610c15.jpg
800 × 505; 69 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section Shaft 1, looking east, Sta. 26+24, West Boylston, Mass., Jun. 15, 1930 - DPLA - 1fbee7f72ea3f2f9ff4430b44888cd0f.jpg
800 × 505; 67 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section, Shaft 1, Sta. 26+24+--, looking east, West Boylston, Mass., Feb. 2, 19 - DPLA - 862ccda7f9c49ad04ac00526649c0b60.jpg
800 × 500; 64 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section, Shaft 1, Sta. 26+24+--, looking west, West Boylston, Mass., Feb. 2, 19 - DPLA - 6b2e858ff0d4af7b1686fb705e3982f3.jpg
800 × 502; 59 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, water coming through top of tunnel between Shafts 2 and 3, Sta. 190+00+--, Holden, Mass., - DPLA - 274e6a49dff87ec5d0a4b34dc3b30254.jpg
800 × 505; 108 KB
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Worcester Phyllite, north shore Wachusett Reservoir, Clinton, Mass., Mar. 19, 1930 - DPLA - f9550e7c280477bdccf59e1e1281f8f3.jpg
800 × 500; 104 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, aggregate piles, Shaft 5, Rutland, Mass., May 5, 1930 - DPLA - 923973f3aa7e937a733edf3997d9c8ef.jpg
800 × 517; 78 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, aggregate with crushers in rear, Shaft 7, Rutland, Mass., Mar. 6, 1930 - DPLA - 7ad372f7ce2ba7e2f84dba8286831c7c.jpg
800 × 499; 83 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bottom of Shaft 6, showing section broken out of tunnel roof, looking east, Quabbin Aqueduct, Rutl - DPLA - 58cddecd90ca7e35c8e7c4add726aee8.jpg
800 × 505; 70 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, east side, Sta. 742+02, Barre, Mass., Jan. 12, 1931 - DPLA - 24211f3abd87ce3688e0518c322077c2.jpg
800 × 503; 65 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, east side, Barre, Mass., Jan. 12, 1931 - DPLA - c3f50afcc3ff0210b6cc8a77682d46c4.jpg
800 × 515; 69 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, west side, Barre, Mass., Jan. 12, 1931 - DPLA - 6a7dcd266668c1a3c35293638ccabd81.jpg
800 × 505; 61 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, west side, Barre, Mass., Jan. 12, 1931 - DPLA - 84bac93ffc0a6d8eea657a96f28914ce.jpg
800 × 505; 63 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, cement house and aggregate piles, Shaft 5, Rutland, Mass., May 5, 1930 - DPLA - b5503028fa7db96b19df211e85aea947.jpg
800 × 516; 93 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, completed riprap for Boston and Albany Railroad, Shaft 8, Barre, Mass., Aug. 26, 1929 - DPLA - fbd958d8f66f1cf032823e726c2285b0.jpg
800 × 495; 81 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete form sills and trim template, Shaft 6, Sta. 495+50+--, Rutland, Mass., May 6, 1930 - DPLA - fbb3199a720153c44ffe22145f3a0cf3.jpg
800 × 504; 86 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete lining, Shaft 6, Rutland, Mass., Mar. 6, 1930 - DPLA - b5eaf9deec7ed5568f688e689eca2a80.jpg
800 × 502; 69 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete mixer and gun, Shaft 6, Sta. 497+80+--, Rutland, Mass., May 6, 1930 - DPLA - 0624619f5b21998a89a18727e9263b3b.jpg
800 × 506; 80 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete placed ready for screeding, Sta. 377+50, Shaft 5, Rutland, Mass., Nov. 4, 1930 - DPLA - e6b35cbacc8fa682e0ae86988096c557.jpg
800 × 505; 72 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant from spoil bank, Shaft 7, Rutland, Mass., Dec. 3, 1929 - DPLA - 898be0c4fe61c78d3534a2d134967cf7.jpg
800 × 498; 79 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant looking north, Shaft 7, Rutland, Mass., Jan. 17, 1930 - DPLA - 9eee01a8b2f1c6945d23cce9fac60569.jpg
800 × 501; 95 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant looking west, Shaft 7, Rutland, Mass., Jan. 17, 1930 - DPLA - 88b4b7bd6ad2a0fb2906fd939b4a8413.jpg
800 × 504; 76 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant northeast from top spoil bank, Shaft 7, Rutland, Mass., Jan. 17, 1930 - DPLA - 00b91609d2f8c5c34255fe1f8596558f.jpg
800 × 508; 80 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant, Shaft 7, northeast from spoil bank, Rutland, Mass., Jan. 17, 1930 - DPLA - d5d7bc54a9a435c0e94d2c098f118b98.jpg
800 × 517; 96 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant, Shaft 7, Rutland, Mass., Dec. 3, 1929 - DPLA - 44bd5dc85bd3140212bafabced5e36a0.jpg
800 × 513; 81 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractor's buildings from spoil bank, Shaft 5, Rutland, Mass., Sep. 30, 1929 - DPLA - 1ecf101869252559810edf013500a5cb.jpg
800 × 515; 90 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractors' camp, Shaft 5, Rutland, Mass., Sep. 30, 1929 - DPLA - e2110cdb8db720816725e1e07aecacfb.jpg
800 × 506; 79 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractors' crew, Shaft 4, looking easterly from Shaft 5 to 4, Rutland, Mass., Jan. 20, 1930 - DPLA - 6b1172defaabcde69506243bf6775345.jpg
800 × 500; 76 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, cut by dragline for crushers, Shaft 7, Rutland, Mass., Mar. 6, 1930 - DPLA - 5f83fce4b42f47282318e5a43b090952.jpg
800 × 504; 86 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dam at site of Shaft 8, Barre, Mass., Jan. 5, 1928 - DPLA - aef79393983b9b059a5e981c1d116698.jpg
800 × 500; 85 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dismantling shaft head works at Shaft 7, Rutland, Mass., Mar. 11, 1931 - DPLA - e601abf4ba58248ed04834e15f4e3a9d.jpg
800 × 502; 76 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dragline and crusher, Shaft 5, Rutland, Mass., May 5, 1930 - DPLA - 5bf8533d71bf0363c5f7203e09201928.jpg
800 × 511; 92 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dragline and muck pile, Shaft 5, Rutland, Mass., May 5, 1930 - DPLA - 23098600ef55a174c8092f968a7aa72f.jpg
800 × 505; 95 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dumping concrete from train on graded invert, Sta. 378+00, Shaft 5, Rutland, Mass., Nov. 4, 1930 - DPLA - cc449029e86f99a1e01cbbe4cbed0aa4.jpg
800 × 501; 64 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, electric winch operates dragline, crushers with aggregate piles in rear, Shaft 7, Rutland, Mass., - DPLA - b80ea7aa6bd9076020d36b10a8a62d3d.jpg
800 × 519; 88 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished grading, Shaft 6 west looking east, Rutland, Mass., Dec. 3, 1929 - DPLA - 7806b4c578906e3abe3eb8e98d23f0d7.jpg
800 × 516; 83 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel concrete bottom of Shaft 6 looking west, Rutland, Mass., May 6, 1930 - DPLA - a33085be10c2e142d40c75afe29d5aca.jpg
800 × 507; 78 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel concrete, bottom Shaft 6 looking east, Rutland, Mass., May 6, 1930 - DPLA - 385c5b60a9a3e5ce2ca2e2d2306d818b.jpg
800 × 504; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel showing invert, side walls and arch, Sta. 373+00, Shaft 5, Rutland, Mass., Nov. 4, - DPLA - f550cd14a24cd5680db11cd46ba65ae6.jpg
800 × 498; 63 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, graded invert ready for concrete with tracks placed to one side for concrete cars, Sta. 378+50, Sh - DPLA - b4ad01e13fe6b84adb2d51df8da7c23b.jpg
800 × 506; 74 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, grading in process, Shaft 7 east looking east, Rutland, Mass., Dec. 3, 1929 - DPLA - 97f8f7f9629e490b0f820ffdc93f3198.jpg
800 × 494; 75 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, group making inspection trip through Quabbin Aqueduct, looking easterly just east of Shaft 6, Rutl - DPLA - a8bfc83b64bf8d4bb4d2c149da305c13.jpg
800 × 517; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading and mucking machine, Shaft 7 east, Sta. 581+90, Rutland, Mass., Aug. 2, 1929 - DPLA - 6276554d67aaf36267f3448ba3b2453c.jpg
800 × 515; 89 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through Shaft 8 to 7, Barre, Mass., Feb. 12, 1930 - DPLA - c8a3d5641b4e137f5889d367e10af08f.jpg
800 × 501; 75 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through, Shaft 5 to 4, engineering force of Shaft 4, Rutland, Mass., Jan. 20, 1930 - DPLA - 9c897ef3adb22d82b1fda7ed4ecb84c6.jpg
800 × 504; 89 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through, Shaft 5 to 4, Rutland, Mass., Jan. 20, 1930 - DPLA - f38c2682fa3f04b620a83725178fdb60.jpg
800 × 508; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading, Shaft 6 east, Sta. 483+00, Rutland, Mass., Aug. 2, 1929 - DPLA - fd4b7b2b3ceb76097653518eb78eb2f5.jpg
800 × 500; 75 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 721+36, west of the Ware River Intake, Barre, Mass., Oct. - DPLA - dc82c84bd919293a009ff9be8ce98124.jpg
800 × 510; 70 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 721+36, west of Ware River Intake, Barre, Mass., Apr. 16, - DPLA - 0c316570ba9aacefdcd4ef4290b826e5.jpg
800 × 512; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 722+28 on north side, west of Ware River Intake, Barre, M - DPLA - a80450753a80d1317c657d47aa65665c.jpg
800 × 503; 63 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 722+28 on north wall, west of the Ware River Intake, Barr - DPLA - 6a86a153764d0e7e5cbe03efbf07e129.jpg
800 × 512; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+10 on the north side, west of the Ware River Intake, - DPLA - 58e98531bbb98d488e9e78cacdb038d9.jpg
800 × 506; 66 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+10 on the north wall, west of the Ware River Intake, - DPLA - 6cc6c70bd343344725f3aba792f31231.jpg
800 × 509; 69 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+43 on the north side, west of the Ware River Intake W - DPLA - 8de322a5a764543ba84088580828ab9b.jpg
800 × 504; 60 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+43 on the north wall, west of the Ware River Intake, - DPLA - a20ae692e2bc1bbbcda683d257c497a2.jpg
800 × 510; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+48 on the north and Sta. 724+50 on the south side, we - DPLA - d44945b14cbbe7c590fff449ad8a173d.jpg
800 × 507; 64 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+48 on the north and Sta. 724+50 on the south wall, we - DPLA - ea52668e2f0ea3acea41fb8664331011.jpg
800 × 507; 70 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+70 and 71 on the north and south sides respectively, - DPLA - 5bb180833934dca8cfe00fc3962423e0.jpg
800 × 508; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+70 on the north and Sta. 724+71 on the south wall, we - DPLA - 20585a342c58f404ebf746e4c6e4756c.jpg
800 × 510; 66 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 726+50 and 71 on the north side, west of the Ware River I - DPLA - 645fd9d93626bdbc4cc607b86960c32c.jpg
800 × 508; 69 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 726+50 on the north wall, west of the Ware River Intake, - DPLA - 1aed7e5b753ac0fb097c093c00dbcc2a.jpg
800 × 513; 73 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking easterly in Quabbin Aqueduct west of Shaft 6, Rutland, Mass., Dec. 8, 1938 - DPLA - 627a90409b15937182066f4391bb4757.jpg
800 × 514; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west in Quabbin Aqueduct at Sta. 723+97 on south wall, west of the Ware River Intake, Barr - DPLA - 48cbeb9c2a8cff3819f324b401202d69.jpg
800 × 514; 75 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west in Quabbin Aqueduct at Sta. 723+97 on the south side, west of the Ware River Intake, - DPLA - afc62954ae2ad33f181b39913662569a.jpg
800 × 503; 65 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west into Shaft 7, Rutland, Mass., Oct. 25, 1929 - DPLA - 5ab8776f3fe16ddf866ac28b42d9accb.jpg
800 × 501; 86 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking westerly at broken section at bottom of Shaft 6, Rutland, Mass., Dec. 8, 1938 - DPLA - 197f71da14698b4ec7af4c33d62f3b7b.jpg
800 × 515; 65 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, pegmatite intrusions, Shaft 6 east, Rutland, Mass., Jan. 17, 1930 - DPLA - b3f8ecb0bc2734b54efc0558f838043a.jpg
800 × 509; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, portable conveyor, Shaft 6 west, Rutland, Mass., Jan. 17, 1930 - DPLA - 3a32a60d6f10d0df727b438fff176c4f.jpg
800 × 501; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, results of fire in compressor room, Mar. 3, 1931, at Shaft 7, looking northeast, Rutland, Mass., M - DPLA - 942ff790e5af97d26f8d7ba69e94fdf2.jpg
800 × 502; 74 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, results of fire in compressor room, Mar. 3, 1931, at Shaft 7, looking southwest, Rutland, Mass., M - DPLA - 0c04ef92a2a110bf2684f8c503a08d58.jpg
800 × 504; 77 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, riprap for Boston and Albany Railroad, Barre, Mass., Aug. 12, 1929 - DPLA - e55a14c48e9174703feaee777b7c968d.jpg
800 × 496; 86 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, riprap on Ware River east of Boston and Maine Railroad trestle, Shaft 8, Barre, Mass., Mar. 6, 193 - DPLA - 6338517656e46ed7500b5a69a51dfc76.jpg
800 × 514; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rock formation, Shaft 8, Sta. 724+50, Barre, Mass., Jul. 29, 1929 - DPLA - ba0f13941bdfca482e3133b13b4cc4ea.jpg
800 × 506; 101 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rock formation, Shaft 8, Sta. 724+80, Barre, Mass., Jul. 29, 1929 - DPLA - 7db33602a7129ab7bd52ebb2e62bcf1e.jpg
800 × 498; 109 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rodmen screeding concrete immediately after placing, Sta. 377+00, Shaft 5, Rutland, Mass., Nov. 4, - DPLA - 1b7d2138b5b11baae65c1ca395b2d70a.jpg
800 × 506; 77 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929 - DPLA - 64ca1945be873fd457c0a4d543b61b3d.jpg
800 × 497; 63 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929 - DPLA - 7ec7cebc6b44f3ed966052d59e6ded4f.jpg
800 × 498; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929 - DPLA - bd30786016c792657dedaa587c2a5449.jpg
800 × 506; 69 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928 - DPLA - 20f8f8466b4b974bfd2b18f5c68ed38b.jpg
800 × 511; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928 - DPLA - b02357a64410592dc0dac38e8626989f.jpg
800 × 511; 78 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928 - DPLA - cc54511fd36931f327f60cacf1b6bd01.jpg
800 × 511; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6 to Shaft 7, engineering force, Rutland, Mass., Oct. 25, 1929 - DPLA - fef05187c4910f9644d815d64cf74f14.jpg
800 × 514; 93 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928 - DPLA - 1d9c5bf4baaed0c7e883aee9bcd4e09f.jpg
800 × 504; 62 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928 - DPLA - 517a397ec18713f6e6bdaec0c7ae847f.jpg
800 × 505; 110 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928 - DPLA - a47b8c831eebc1333e205884bbb4e05a.jpg
800 × 511; 81 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928 - DPLA - e45487d4f7e1e33037b19a0945d1d82e.jpg
800 × 497; 73 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, looking east into Shaft 6, Rutland, Mass., Oct. 25, 1929 - DPLA - 5e479392247c90eda98517393eb895f2.jpg
800 × 514; 97 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, looking east into Shaft 6, Rutland, Mass., Oct. 25, 1929 - DPLA - a8decb23e5509e38b0550cf3009d684e.jpg
800 × 518; 88 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928 - DPLA - 78c746877f35d52c1b41b32b9a0d10d4.jpg
800 × 504; 77 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928 - DPLA - a736c0ba8d28c3c51f34bcdedb579d9f.jpg
800 × 504; 73 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928 - DPLA - cf827ada97e6e8590683e7bab649efc2.jpg
800 × 504; 68 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928 - DPLA - dd61ac635bd1d93f7e79d5a68841d3e6.jpg
800 × 513; 82 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928 - DPLA - 0c98a32fb4d1179a332bac52097e4b9f.jpg
800 × 505; 94 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928 - DPLA - 5ba914e0d6fa60e1b8547e3a83142d99.jpg
800 × 501; 91 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928 - DPLA - 755f460ecc1574501d0fd026843b865e.jpg
800 × 504; 87 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928 - DPLA - 898e4a75c69a0ffc327e8661b0b9fe96.jpg
800 × 503; 106 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928 - DPLA - d312d6cbf9c4b92cd07f2acaa07d34d9.jpg
800 × 502; 95 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928 - DPLA - 3f02fb2ee17a2822a963da0d62e6331d.jpg
800 × 506; 58 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928 - DPLA - 7fad3fa9b66b8ff1626ae249e2a82ec8.jpg
800 × 500; 55 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928 - DPLA - c9409d9a8bc143bd8b893e7e38a7c3f9.jpg
800 × 500; 57 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, east heading, Barre, Mass., May 3, 1929 - DPLA - 1e39cf955196fa0ad5624ec5147e2499.jpg
800 × 510; 96 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, site for spoil bank, south of river, Barre, Mass., Aug. 12, 1929 - DPLA - c3426d9640a2550a04dccd2508fdf913.jpg
800 × 496; 67 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, site of Shaft 8, Barre, Mass., Jan. 5, 1928 - DPLA - d5ecdf66f20e94f45e446d1a888c5c66.jpg
800 × 502; 89 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, spoil bank and contractors buildings, Shaft 6, Rutland, Mass., Sep. 30, 1929 - DPLA - b542d4d07c1b23af4c362b7913e69bb9.jpg
800 × 497; 85 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, spoil bank and contractors buildings, Shaft 7, Rutland, Mass., Sep. 30, 1929 - DPLA - 60fd61780f42a351ab59ba63410607a9.jpg
800 × 511; 65 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 483+15, Shaft 6 east, Rutland, Mass., Aug. 2, 1929 - DPLA - e77b3b1888b0d3e3fabe9f51e223adb1.jpg
800 × 509; 100 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 485+35, Shaft 6 east, Rutland, Mass., Aug. 2, 1929 - DPLA - dec2ea3f9375a6a7f2ca6d82a69b8c73.jpg
800 × 502; 77 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 503+50, Shaft 6 east, Rutland, Mass., Aug. 2, 1929 - DPLA - a6132c8972abae1d0c139fa3437becaf.jpg
800 × 504; 101 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 504+60, Shaft 6 east, Rutland, Mass., Aug. 2, 1929 - DPLA - 050b81d79be0cbe09def13e60d5a7e15.jpg
800 × 496; 84 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 534+70, Shaft 6 west, Rutland, Mass., Aug. 2, 1929 - DPLA - a4d72f11084558004a483ed9420ee906.jpg
800 × 516; 85 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 594+65, Shaft 7 east, Rutland, Mass., Aug. 2, 1929 - DPLA - bd8dd30fc889b2df69827ec61b7c016f.jpg
800 × 499; 70 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 597+20, Shaft 7, Rutland, Mass., Aug. 2, 1929 - DPLA - 1735d53bf3f2df60becba25e4af37a0f.jpg
800 × 502; 76 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 604+25, Shaft 7 east, Rutland, Mass., Aug. 2, 1929 - DPLA - 9bc60ee587f7648cfca5138fcbe222cf.jpg
800 × 496; 88 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 616+40, Shaft 7 east, Rutland, Mass., Aug. 2, 1929 - DPLA - 2907b23aef4f35004d2b58a57ee85bda.jpg
800 × 501; 79 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 630+53, Shaft 7, Rutland, Mass., Aug. 2, 1929 - DPLA - 0f574cfff87b5fddc3b48222d066752f.jpg
800 × 501; 79 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 637+06, Shaft 7 west, Rutland, Mass., Aug. 2, 1929 - DPLA - a37ddd4d1bcebef52780f9c0267335df.jpg
800 × 499; 85 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, steel forms for concrete, Shaft 6 west, Rutland, Mass., Jan. 17, 1930 - DPLA - 005b9c83f2f5df56c31ed965b22fbf79.jpg
800 × 501; 88 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, steel forms for concrete, Shaft 6 west, Rutland, Mass., Jan. 17, 1930 - DPLA - 269159a44496a9c11254842895de1eec.jpg
800 × 503; 92 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, stripped form on jumbo being moved ahead, Shaft 6, Sta. 501+25+--, Rutland, Mass., May 6, 1930 - DPLA - 0229baa478b66f12b753c1a8f4c85997.jpg
800 × 508; 83 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, stripping form, Shaft 6, Sta. 501+50+--, Rutland, Mass., May 6, 1930 - DPLA - f42fc569ce0be24663eb2ebc32ee1407.jpg
800 × 513; 73 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, trestle for spoil bank on south of river, Barre, Mass., Aug. 12, 1929 - DPLA - 1ef80fbc0db14050597117c1cf1e955a.jpg
800 × 494; 96 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, tunnel lining equipment, Shaft 6 west, Rutland, Mass., Jan. 17, 1930 - DPLA - d7c349663cd139a5e2038084d43899fd.jpg
800 × 501; 71 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Ware River Intake Works, Shaft 8, Barre, Mass., Aug. 19, 1930 - DPLA - 3a359e1660c5ee32b1ae93a219fc8670.jpg
800 × 500; 85 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, water flow at Sta. 483+05+--, piped and tinned, ready for concrete, Shaft 6, Rutland, Mass., May 6 - DPLA - 34a9622a61edb083776aadb3ba8fd24a.jpg
800 × 507; 99 KB
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, weir for measuring flow of water from pumps at bottom of Shaft 8, Barre, Mass., Aug. 19, 1930 - DPLA - de54e353b02678c7b850ad43a7977a61.jpg
800 × 497; 93 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, canal outlet, Shaft 8, Barre, Mass., Jul. 29, 1929 - DPLA - 4fe771679863e855bac0376330c830e2.jpg
800 × 509; 84 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, culvert under Boston and Albany Railroad near Shaft 8, Barre, Mass., - DPLA - 9ab4d7ea82516416252ad0a64460b520.jpg
800 × 508; 90 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, culvert under Boston and Albany Railroad near Shaft 8, Barre, Mass., - DPLA - b19d5164b68add539ccb500b3166bb94.jpg
800 × 508; 105 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, dam facing and Venturi meter outlet, Shaft 8, Barre, Mass., Nov. 30, - DPLA - dcc19c4e7398d9530345fb3850d28d60.jpg
800 × 514; 92 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, dam facing south end, Shaft 8, Barre, Mass., Nov. 30, 1929 - DPLA - 21f897c0f42aa3411b2ecfa1e4e02885.jpg
800 × 511; 91 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, first water taken from Ware River into Wachusett Coldbrook Tunnel thr - DPLA - 21eb5c8ad21c67f106656ecc8c9c616b.jpg
800 × 506; 68 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, first water taken from Ware River into Wachusett Coldbrook Tunnel thr - DPLA - 78d6ca4836c1e769258fe3b3bb4c39bc.jpg
800 × 509; 66 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, flume at lower end mill head race, Barre, Mass., Aug. 12, 1929 - DPLA - 6d5bad0ca89503d82f4130d076a85270.jpg
800 × 492; 98 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, from top of spoil bank near shaft looking west, Barre, Mass., Sep. 17 - DPLA - 599c3713bafd75abd5f563803d781d45.jpg
800 × 495; 85 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, general view of construction from Boston and Albany Railroad grade, S - DPLA - d015ea18dc86c384fef7aa67fa7d2da9.jpg
800 × 494; 98 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, general view of construction, from Boston and Albany Railroad, Shaft - DPLA - 7c19b46d10a4fe17d53276d6e78d0efd.jpg
800 × 497; 86 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - 1da50feddfec87dcf14e107d42ee3866.jpg
800 × 498; 82 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - 50088c47974a25d5adbfa41d19ca8c66.jpg
800 × 498; 80 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - 68c33c5f6fe9441228ef62da56c0f2ef.jpg
800 × 500; 104 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - 9398bcea39d6760d029653c73944673e.jpg
800 × 499; 76 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - 99e21f73fdea7c49196bc3f8569d07b6.jpg
800 × 502; 99 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - d925021e3d43f7e1574f382a24ad5e39.jpg
800 × 497; 104 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Works, Shaft 8, Barre, Mass., Jul. 15, 1930 - DPLA - f8d3d9a352f497e7bccbb9735cf03159.jpg
800 × 499; 87 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, intake works, Shaft 8, Barre, Mass., Nov. 30, 1929 - DPLA - 1bcc7e089b2c845f82228315cc9db3c0.jpg
800 × 511; 104 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, looking down mill head race, Barre, Mass., Aug. 12, 1929 - DPLA - 7bfaad317b7bee0b4a0765be65f3cfab.jpg
800 × 514; 116 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, looking northeast from Boston and Albany Railroad, Barre, Mass., Aug. - DPLA - e1baca3b8ae28cf088e47e10b13951a7.jpg
800 × 512; 87 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, looking northeast from Boston and Albany Railroad, Shaft 8, Barre, Ma - DPLA - 5a07885550ae53c17318c842aa09d987.jpg
800 × 510; 90 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, looking southwest from top of fill, Barre, Mass., Aug. 12, 1929 - DPLA - 910188f56db278d0bdb1b4fb8eb6d41d.jpg
800 × 511; 95 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, main control valves in valve pit, Ware River Intake Works, Barre, Mas - DPLA - 2356859b1ef093654cb2ad9d58eb2657.jpg
800 × 510; 92 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, north abutment of intake works from west, Shaft 8, Barre, Mass., Oct. - DPLA - 1b5ef4388234d86058dd97da4c0ac311.jpg
800 × 502; 99 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, outlet from pond, Shaft 8, Barre, Mass., Jul. 29, 1929 - DPLA - 1874f7446d298f6c4ef529a4593558e9.jpg
800 × 510; 125 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, photo no. 1 of south abutment of intake, Shaft 8, Barre, Mass., Sep. - DPLA - 559ae3ca8dde7131ea251a0e849273f8.jpg
800 × 520; 107 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, photo no. 2 of foundation for intake building, Shaft 8, Barre, Mass., - DPLA - 147650271851ab149590ecb189cbfacd.jpg
800 × 497; 92 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, photo no. 2, south abutment of intake works, Shaft 8, Barre, Mass., S - DPLA - 26265f285965eb405a744ec966a7d82f.jpg
800 × 499; 89 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama 3, photo no. 1, Shaft 8, Barre, Mass., Aug. 28, 192 - DPLA - 49fee650c8df04fd30c8f3c13fa4feee.jpg
800 × 510; 85 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama 3, photo no. 2, Shaft 8, Barre, Mass., Aug. 26, 192 - DPLA - 9a88ff3614edbec2de5c78b652241868.jpg
800 × 498; 85 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama 3, photo no. 3, Shaft 8, Barre, Mass., Aug. 28, 192 - DPLA - 8bf54f178863af34cf9572c01dcf5c0e.jpg
800 × 512; 80 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama, Shaft 8, dam and head house foundation, Barre, Mas - DPLA - 0f827e12cbdfe691e36ea3577842e40f.jpg
800 × 512; 113 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama, Shaft 8, stone wing wall and head house foundation - DPLA - cf086ed166d730806026cb00c839b94d.jpg
800 × 509; 101 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama, Shaft 8, stone wing wall and south bank, Barre, Ma - DPLA - 25b23af94546626637efd1da17c39f9f.jpg
800 × 509; 100 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress photo from Boston and Albany Railroad, Shaft 8, Barre, Mass. - DPLA - 51e8bd274f13773ddafc7ef83e4f4236.jpg
800 × 513; 94 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress photo from top of fill, Shaft 8, Barre, Mass., Nov. 30, 1929 - DPLA - fb56d7832fb8c90bca2a9f30db309fa4.jpg
800 × 510; 88 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, rock foundation for intake building, Shaft 8, Barre, Mass., Sep. 4, 1 - DPLA - acee33c5882e2dbd68393d8cd3e3f429.jpg
800 × 504; 103 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Shaft 8 from Boston and Albany Railroad tracks, Barre, Mass., Aug. 2, - DPLA - 0b8f14ab1b145f86e12aa372fc76102b.jpg
800 × 512; 80 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Shaft 8 from Boston and Albany Railroad tracks, Barre, Mass., Aug. 2, - DPLA - 6f8d77ca1f0864a217710788665c9722.jpg
800 × 509; 96 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Shaft 8 from Boston and Albany Railroad tracks, Barre, Mass., Aug. 2, - DPLA - ce5a8745cc15cd277d859fbc4f2013f5.jpg
800 × 509; 91 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, siphons in inlet head house foundation, Shaft 8, Barre, Mass., Jul. 2 - DPLA - 094bf040ed0a6f9b297cd75ca8e9afdc.jpg
800 × 510; 88 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, south bank of Ware River above dam, Shaft 8, Barre, Mass., Aug. 19, 1 - DPLA - c6153922ffe7aad2035d77855b1f1f23.jpg
800 × 502; 102 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Venturi meter recorders and operating panel, intake building, Shaft 8 - DPLA - 805fd5700d9b46cd225523f3b1034553.jpg
800 × 508; 77 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, view of construction from fill near Shaft 8 looking southwest, Barre, - DPLA - 7ae3050755d1d73524fefee9742ad3f0.jpg
800 × 496; 85 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Ware River above Shaft 8, Barre, Mass., Nov. 10, 1930 - DPLA - 51ff4c43785ded1572d1834869471b3c.jpg
800 × 510; 78 KB
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Ware River above Shaft 8, Barre, Mass., Nov. 10, 1930 - DPLA - 585e4f526c78cffcf3778c6187ff7577.jpg
800 × 517; 74 KB
(previous page) (
next page
)
Categories
:
Aqueducts in Massachusetts
Tunnels in Massachusetts
Wachusett Reservoir
Navigation menu
Personal tools
English
Not logged in
Talk
Contributions
Create account
Log in
Namespaces
Category
Discussion
English
Views
View
Edit
History
More
Search
Navigate
Main page
Welcome
Community portal
Village pump
Help center
Participate
Upload file
Recent changes
Latest files
Random file
Contact us
Tools
What links here
Related changes
Special pages
Permanent link
Page information
Get shortened URL
Download QR code
Print/export
Create a book
Download as PDF
Printable version
In other projects
In Wikipedia
Add links