Category:Union Square Branch (MBTA Green Line) construction
Jump to navigation
Jump to search
Subcategories
This category has the following 2 subcategories, out of 2 total.
Media in category "Union Square Branch (MBTA Green Line) construction"
The following 9 files are in this category, out of 9 total.
-
SWIFT interlocking work, December 2015.JPG 4,320 × 3,240; 4.09 MB
-
Swift Interlocking work, December 2017.jpg 1,224 × 1,632; 789 KB
-
Moving ties to Union Square station site, October 2018.jpg 1,280 × 720; 335 KB
-
Drilled shaft cleaning with muck bucket, April 2019.jpg 1,280 × 960; 307 KB
-
Unloading rail at Swift Interlocking, April 2019.jpg 1,280 × 720; 427 KB
-
Grand Junction Branch from Squires Bridge, July 2021.jpg 4,032 × 3,024; 6.63 MB
-
Union Square Branch from Squires Bridge, July 2021.jpg 4,032 × 3,024; 6.23 MB
-
Union Square Branch and D2.3 construction, December 2021.JPG 4,439 × 3,335; 6.12 MB
-
Union Square Branch crossover from Fitchburg Line train, December 2021.jpg 4,032 × 3,024; 4.69 MB