Category:Tram track construction at Spreestraße (2019)
Jump to navigation
Jump to search
2019-06-16 to 2019-08-16 (mostly complete except for the signalling).
English: Replacement of switch #112, repairs to road surface and the bridge over Priorgraben. Undertaken in conjunction with remodeling Madlow as an interchange station.
Subcategories
This category has the following 12 subcategories, out of 12 total.