Category:Temporary passage of Takanawa Bridge Overpass, May 2021
Jump to navigation
Jump to search
English: Category for the temporary passage made available from May 2021 in accordance with construction of the planned Takanawa Gate City buildings in Minato Ward, Tokyo, Japan
日本語: 2021年5月11 - 31日まで一部区間が仮設の迂回路となった高輪橋架道橋。2019年11月16日まで山手線・京浜東北線軌道があった高輪ゲートシティ建設予定地の地上(工事現場内)を通り、現行供用線路部分は従来の地下道に合流する。6月1日からのルートは Re-routing Takanawabashi overpass を参照。
Media in category "Temporary passage of Takanawa Bridge Overpass, May 2021"
The following 6 files are in this category, out of 6 total.
-
Detour route Takanawabashi overpass 01.jpg 3,648 × 2,736; 2.47 MB
-
Detour route Takanawabashi overpass 02.jpg 3,648 × 2,736; 2.52 MB
-
Detour route Takanawabashi overpass 03.jpg 3,648 × 2,736; 2.49 MB
-
Detour route Takanawabashi overpass 04.jpg 3,648 × 2,736; 2.35 MB
-
Detour route Takanawabashi overpass 05.jpg 3,648 × 2,736; 2.52 MB
-
Takanawa Chikutei view from Detour route Takanawabashi overpass.jpg 2,736 × 3,648; 2.53 MB