Category:Temporary one-way system, Wetherby (July-August 2020)
Jump to navigation
Jump to search
This one way system was supposedly to increase footpath space for social distancing during the COVID-19 pandemic. As can be seen it does nothing of the sort. Having just been set up a day before taking it was removed at the beginning of August 2020.
Media in category "Temporary one-way system, Wetherby (July-August 2020)"
The following 6 files are in this category, out of 6 total.
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 001.jpg 5,152 × 3,864; 4.46 MB
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 002.jpg 5,152 × 3,864; 5.55 MB
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 003.jpg 5,152 × 3,864; 5.18 MB
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 004.jpg 5,152 × 3,864; 4.66 MB
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 005.jpg 5,152 × 3,864; 4.83 MB
-
Temporary one way system due to the COVID-19 pandemic in Wetherby (24th July 2020) 006.jpg 5,152 × 3,864; 4.44 MB