Category:Shore Line East in 2020
Jump to navigation
Jump to search
Media in category "Shore Line East in 2020"
The following 4 files are in this category, out of 4 total.
-
Clinton station construction from the south platform, October 2020.JPG 5,184 × 3,888; 3.42 MB
-
Clinton station construction from the south, October 2020.JPG 4,850 × 3,528; 2.77 MB
-
Clinton station during second platform construction, October 2020.jpg 4,032 × 3,024; 4.12 MB
-
Stair construction at Clinton station, October 2020.jpg 4,032 × 3,024; 5.12 MB