Category:Schools under the auspices of Sustainable Sanitation Alliance
Jump to navigation
Jump to search
Subcategories
This category has the following 4 subcategories, out of 4 total.
S
- Schools in Cagayan de Oro City (27 F)
- Schools in Tianshui (52 F)
- Schools in Ukunda (116 F)
Media in category "Schools under the auspices of Sustainable Sanitation Alliance"
The following 200 files are in this category, out of 364 total.
(previous page) (next page)-
1. Brick spiral VIP (5567225993).jpg 1,560 × 2,210; 1.07 MB
-
A pre-unit pupil (5 years old using the urinal) (5507771544).jpg 480 × 640; 169 KB
-
A pupil receives a urinal on behalf of boys (5507775454).jpg 640 × 480; 211 KB
-
A pupil receives a urinal on behalf of girls (5507176143).jpg 640 × 480; 201 KB
-
Application of diluted urine to the young gum trees (5567571147).jpg 2,592 × 1,944; 1.95 MB
-
Application of urine (5450113445).jpg 663 × 495; 66 KB
-
Applying mixture of water and urine to the maize plants (5568155546).jpg 2,048 × 1,536; 1.34 MB
-
Applying urine to the maize plants using small dispensers (5568155364).jpg 2,048 × 1,536; 1.43 MB
-
Backfilling of dome and other finishes (5363269103).jpg 2,576 × 1,932; 1.26 MB
-
Bending of metal rods for reinforcement (5363265053).jpg 1,632 × 1,224; 864 KB
-
Biogas flame (5363885380).jpg 2,576 × 1,932; 1.24 MB
-
Biogas piping in kitchen during construction (5363272145).jpg 2,576 × 1,932; 1.27 MB
-
Biogas piping is reaching the kitchen (5363882792).jpg 1,932 × 2,576; 1.34 MB
-
Biogas set up in detail (5363273033).jpg 1,932 × 2,576; 988 KB
-
Block for the dome construction were made on-site (5363263975).jpg 2,576 × 1,932; 1.26 MB
-
Blue flame is typical for a well adjusted biogas flame (5363272595).jpg 2,576 × 1,932; 1.27 MB
-
Boys urinal (5507170551).jpg 640 × 480; 182 KB
-
Building a spiral brick VIP toilet with special templates (5567265461).jpg 2,592 × 1,944; 1.59 MB
-
Building of a brick toilet structure in Chisungu school (5567849160).jpg 2,592 × 1,944; 1.93 MB
-
Building of a spiral brick VIP in Chisungu (5567264499).jpg 2,592 × 1,944; 1.74 MB
-
Building of a wooden frame for Arborloo (5567263767).jpg 2,048 × 1,536; 1.38 MB
-
Building VIP doored structure (5567263979).jpg 2,048 × 1,536; 1.3 MB
-
Casting of bio-digester slab with ring reinforcement (5363877450).jpg 2,576 × 1,932; 1.26 MB
-
Casting of lids for expansion chamber (5363882130).jpg 1,932 × 2,576; 1.62 MB
-
Changing container Process 1 (5507771350).jpg 640 × 480; 211 KB
-
Changing Container Process 3 (5507771042).jpg 480 × 640; 205 KB
-
Checking gas tightness of main valve and fittings (5363271397).jpg 640 × 480; 131 KB
-
Chisungu School (5566871711).jpg 2,592 × 1,944; 1.8 MB
-
Chisungu school (5566956403).jpg 1,944 × 2,592; 1.85 MB
-
Chisungu School Demonstrates how to get urine out (5567455156).jpg 2,592 × 1,944; 1.52 MB
-
Chisungu school open day (5566871861).jpg 2,592 × 1,944; 1.7 MB
-
Chisungu School outreach program (5567442937).jpg 2,592 × 1,944; 1.86 MB
-
Clueing of pipes (5363270803).jpg 1,932 × 2,576; 926 KB
-
Concrete slab (5567263867).jpg 2,048 × 1,536; 940 KB
-
Connection of biogas burner to biogas pipe (5363885282).jpg 1,932 × 2,576; 1.08 MB
-
Constructed toilet (5568027308).jpg 2,592 × 1,944; 2.12 MB
-
Constructing the school UDDTs (5735842459).jpg 260 × 300; 61 KB
-
Construction of bottom outlet chamber (5363880778).jpg 1,224 × 1,632; 800 KB
-
Construction of water trap manhole (5363883592).jpg 640 × 480; 130 KB
-
Construction using bricks in Chisungu school (5567849032).jpg 2,007 × 1,488; 675 KB
-
Conventional porcelain urinals used as waterless boys urinals (5051359596).jpg 4,288 × 2,848; 2.59 MB
-
Cutting of PVC 1,5" pipes, Class C, with wire (5363270909).jpg 2,576 × 1,932; 1.22 MB
-
Delivery of materials to the construction side (5363265133).jpg 1,632 × 1,224; 918 KB
-
Demonstration of biogas cooker in big stove (5363885474).jpg 2,576 × 1,932; 1.26 MB
-
Desludging manhole (Bottom outlet) (5363271337).jpg 640 × 480; 131 KB
-
Detail of biogas burner (5363272481).jpg 2,576 × 1,932; 1.26 MB
-
Detail of bottom outlet pipe (5363881100).jpg 1,632 × 1,224; 905 KB
-
Detail of water trap manhole (5363271469).jpg 640 × 480; 129 KB
-
Detail of wedging the lid of the neck (5363882568).jpg 1,932 × 2,576; 1.24 MB
-
Detail outlet pipe expansion chamber (5363267977).jpg 1,632 × 1,224; 935 KB
-
Digging of the pit for the bio-digester (5363415678).jpg 2,576 × 1,932; 1.26 MB
-
Digging of the pit for the bio-digester (5363416210).jpg 1,632 × 1,224; 916 KB
-
Diluting urine with water in watering cans (5567571481).jpg 2,592 × 1,944; 1.58 MB
-
Discussion during the planning phase (5507170307).jpg 640 × 480; 181 KB
-
Discussion during the planning phase at the school (5507169815).jpg 640 × 480; 162 KB
-
Disposal of sanitary napkins (5363415492).jpg 1,928 × 2,576; 1.24 MB
-
Dome of bio-digester under construction (5363265413).jpg 2,576 × 1,932; 1.24 MB
-
Doors of faeces chambers (5716328376).jpg 640 × 480; 103 KB
-
Downside of lids (5363268865).jpg 640 × 480; 132 KB
-
Drilling of a hole by students (5566955789).jpg 2,592 × 1,944; 1.58 MB
-
During construction (5363880966).jpg 1,632 × 1,224; 928 KB
-
During construction of expansion chambers (5363267897).jpg 1,632 × 1,224; 905 KB
-
During filling of biogas digester is filled with water (5363271005).jpg 640 × 480; 135 KB
-
EcoSan Promotion Project (5078140424).jpg 1,536 × 2,048; 1.37 MB
-
Ecosan schools project (5570799264).jpg 2,048 × 1,536; 1.31 MB
-
Emptying of the faeces vault (5631216004).jpg 3,072 × 2,048; 2.76 MB
-
Entrance to the school (5363264119).jpg 2,576 × 1,932; 1.25 MB
-
Entry point (stair case) from the expansion chambers into the bio-digester (5363879606).jpg 2,576 × 1,932; 1.24 MB
-
Erase (5363884526).jpg 1,932 × 2,576; 1.04 MB
-
Expansion chambers with effluent pipe (5363882660).jpg 1,632 × 1,224; 907 KB
-
Faecal matter inside drying shed (5050747519).jpg 4,288 × 2,848; 5.21 MB
-
Faeces Chamber of a UDDT (5716327394).jpg 360 × 480; 72 KB
-
Feeding pipe into the bio-digester (5363879954).jpg 2,576 × 1,932; 1.25 MB
-
Finished kitchen biogas setup (5363273405).jpg 1,932 × 2,576; 1.06 MB
-
Finished neck construction with biogas pipe and pipes for wedging (5363269233).jpg 2,576 × 1,932; 1.23 MB
-
First day practical at the school garden (5570209457).jpg 2,048 × 1,536; 1.4 MB
-
First layers of stones are laid (5363264965).jpg 1,632 × 1,224; 823 KB
-
Fitting for piping PVC 1,5", Class C (5363882922).jpg 2,576 × 1,932; 1.2 MB
-
Fixing of the central pole and levels (5363416286).jpg 1,632 × 1,224; 920 KB
-
Flushing device of students toilets (5363879244).jpg 640 × 480; 132 KB
-
Garden Experiment using urine as fertiliser (5570209599).jpg 2,048 × 1,536; 1.06 MB
-
Garden trials using urine on treated green vegetables (5568154546).jpg 2,048 × 1,536; 1.4 MB
-
Girls urinal (5051362314).jpg 4,288 × 2,848; 2.83 MB
-
Girls Urinal 8 - Pathway 2 (5507174655).jpg 640 × 480; 203 KB
-
Girls VIP toilet built by pupils (5567810470).jpg 2,592 × 1,944; 1.89 MB
-
Girls’ and boys’ UDDTs (5050739027).jpg 4,288 × 2,848; 4.52 MB
-
Glass bottles are inserted into the toilet wall (5567264651).jpg 1,593 × 1,812; 571 KB
-
Gto sanabc eschborn 20101023 002 (5161716414).jpg 3,888 × 2,592; 3.26 MB
-
Gto sanabc eschborn 20101023 007 (5161114035).jpg 3,888 × 2,592; 3.26 MB
-
Gto sanabc eschborn 20101023 009 (5161719558).jpg 3,888 × 2,592; 3.76 MB
-
Gto sanabc eschborn 20101023 012 (5161120093).jpg 3,888 × 2,592; 2.3 MB
-
Gto sanabc eschborn 20101023 013 (5161121925).jpg 3,888 × 2,592; 3.87 MB
-
Gto sanabc eschborn 20101023 015 (5161727426).jpg 3,888 × 2,592; 3.36 MB
-
Gto sanabc eschborn 20101023 016 (5161124709).jpg 3,888 × 2,592; 3.2 MB
-
Gto sanabc eschborn 20101023 018 (5161126499).jpg 3,888 × 2,592; 4.34 MB
-
Gto sanabc eschborn 20101023 027 (5161733744).jpg 2,592 × 3,888; 3.97 MB
-
Gto sanabc eschborn 20101023 035 (5161735278).jpg 3,888 × 2,592; 3.49 MB
-
Gto sanabc eschborn 20101023 038 (5161132361).jpg 3,888 × 2,592; 3.15 MB
-
Gto sanabc eschborn 20101023 039 (5161133989).jpg 2,592 × 3,888; 3.49 MB
-
Gto sanabc eschborn 20101023 042 (5161135681).jpg 3,888 × 2,592; 3.79 MB
-
Gto sanabc eschborn 20101023 044 (5161137587).jpg 3,888 × 2,592; 4.52 MB
-
Gto sanabc eschborn 20101023 045 (5161743434).jpg 3,888 × 2,592; 3.67 MB
-
Gto sanabc eschborn 20101023 048 (5161745174).jpg 3,888 × 2,592; 3.8 MB
-
Gto sanabc eschborn 20101023 052 (5161747806).jpg 3,702 × 2,502; 5.56 MB
-
Gto sanabc eschborn 20101023 068 (5161145649).jpg 3,888 × 2,592; 3.28 MB
-
Gto sanabc eschborn 20101023 072 (5161751048).jpg 3,888 × 2,592; 3.21 MB
-
Gto sanabc eschborn 20101023 074 (5161148603).jpg 3,888 × 2,592; 2.79 MB
-
Gto sanabc eschborn 20101023 075 (5161754148).jpg 3,888 × 2,592; 3.36 MB
-
Gto sanabc eschborn 20101023 078 (5161153483).jpg 3,888 × 2,592; 3.07 MB
-
Gto sanabc eschborn 20101023 083 (5161758902).jpg 3,888 × 2,592; 3.46 MB
-
Gto sanabc eschborn 20101023 088 (5161760326).jpg 3,888 × 2,592; 3.39 MB
-
Gto sanabc eschborn 20101023 093 (5161762102).jpg 3,888 × 2,592; 3.56 MB
-
Gto sanabc eschborn 20101023 097 (5161763834).jpg 3,888 × 2,592; 3.53 MB
-
Gto sanabc eschborn 20101023 115 (5161163071).jpg 3,888 × 2,592; 5.55 MB
-
Gto sanabc eschborn 20101023 146 (5161177099).jpg 2,592 × 3,888; 3.35 MB
-
Gto sanabc eschborn 20101023 147 (5161782462).jpg 3,888 × 2,592; 4.12 MB
-
Gto sanabc eschborn 20101023 bearb 120 (5161768922).jpg 3,748 × 1,778; 4.13 MB
-
Gum trees in Chisungu school (5567539148).jpg 2,592 × 1,944; 2.11 MB
-
Gum trees planted around VIP (5566956577).jpg 2,112 × 1,893; 1.42 MB
-
Handwashers at toilets in the school (5570799528).jpg 2,048 × 1,536; 1.12 MB
-
Handwashing infrastructure (5716327546).jpg 640 × 480; 112 KB
-
Healthy grown Spinach in a school garden (5568156752).jpg 2,592 × 1,944; 2.17 MB
-
Healthy spinach in a school garden (urine fertilised) (5567570757).jpg 1,944 × 2,592; 1.6 MB
-
HU 1 - Group discussion (5507169627).jpg 640 × 480; 172 KB
-
Inlet chamber for bio-digester under construction (5363266553).jpg 640 × 480; 130 KB
-
Inlet chamber of bio-digester (5363882304).jpg 640 × 480; 132 KB
-
Inside the expansion chambers (5363267699).jpg 1,632 × 1,224; 860 KB
-
Inside view (3) (5631215382).jpg 3,072 × 2,304; 2.3 MB
-
Johannes the preacher (5078140082).jpg 4,000 × 3,000; 4.19 MB
-
Kids at local welder shop (Kagwe) (5363269511).jpg 1,932 × 2,576; 1.03 MB
-
Kitchen team is enjoying tea that was cooked with biogas (5363885710).jpg 1,932 × 2,576; 1.04 MB
-
Laying bricks in Chisungu school (5567848338).jpg 2,048 × 1,536; 1.17 MB
-
Laying of bricks by pupils in Muteesa PS (5567265373).jpg 2,592 × 1,944; 1.39 MB
-
Laying of stones with counterweight (5363877952).jpg 2,576 × 1,932; 1.25 MB
-
Local welder (Kagwe) (5363269359).jpg 1,932 × 2,576; 1.02 MB
-
Location is within tea producing area of Githunguri (5363414702).jpg 2,048 × 1,536; 828 KB
-
Look into the expansion chamber (5363883786).jpg 640 × 480; 128 KB
-
Making concrete slabs for toilets by pupils (5567847846).jpg 2,048 × 1,536; 1.17 MB
-
Making of a hand washing device (5570209395).jpg 2,048 × 1,536; 871 KB
-
Making of a pedestal by students (5567848954).jpg 2,048 × 1,536; 866 KB
-
Making of concrete slab (5567265093).jpg 2,592 × 1,944; 1.61 MB
-
Making the ring beams for Fossa alterna (5372104523).jpg 879 × 656; 106 KB
-
Manifold for urine of UDDTs (5716327686).jpg 640 × 480; 123 KB
-
Mason Mzee is one of the qualified staff from the construction company (5363267467).jpg 1,932 × 2,576; 1.14 MB
-
Measuring the maize cobs after cropping (5568156504).jpg 2,592 × 1,944; 1.34 MB
-
Measuring the weight of individual plants (5568155136).jpg 2,048 × 1,536; 1.15 MB
-
Mixing of concrete (5363264713).jpg 2,576 × 1,932; 1.25 MB
-
Mixing of concrete by students (5567849572).jpg 2,592 × 1,944; 1.8 MB
-
Mixing of urine (5450722864).jpg 798 × 599; 90 KB
-
Mounting the slab over the pit by students (5567264405).jpg 1,671 × 1,911; 921 KB
-
Mulberry tree planted in a soil with a compost mix (5567538912).jpg 1,944 × 2,592; 1.56 MB
-
Mwala primary school UDDT (5078140238).jpg 4,000 × 3,000; 4.33 MB
-
Neck construction (5363880858).jpg 1,632 × 1,224; 863 KB
-
Neck of bio-digester (5363269969).jpg 2,576 × 1,932; 1.27 MB
-
Neck of bio-digester after planting of grass (5363271645).jpg 3,504 × 2,336; 4.06 MB
-
New toilet building (5715764867).jpg 640 × 480; 167 KB
-
Open excreta collection chambers (4359595778).jpg 2,592 × 1,944; 1.69 MB
-
Opened cap (5546716289).jpg 1,489 × 2,457; 1.44 MB
-
Overflowing manhole (5362805133).jpg 2,576 × 1,932; 1.2 MB
-
P1030570 (5629059044).jpg 1,200 × 1,600; 222 KB
-
P1030824 (5629057238).jpg 1,199 × 1,600; 253 KB
-
P1030833 (5628475433).jpg 1,300 × 1,600; 263 KB
-
P1030837 (5628474985).jpg 1,600 × 1,200; 206 KB
-
P1030840 (5628474683).jpg 1,600 × 1,204; 162 KB
-
Piping work on the neck (5363882222).jpg 1,932 × 2,576; 1.33 MB
-
Pit cover at boys’ latrines at St. Peter’s Rambula Mixed Secondary School (5050690237).jpg 2,848 × 4,288; 4.26 MB
-
Pit latrine (for boys) at St. Peter’s Rambula Mixed Secondary School (5050691605).jpg 4,288 × 2,848; 4.96 MB
-
Pit latrines that have been used earlier (5050737563).jpg 4,288 × 2,848; 4.51 MB
-
Placing the pipes in the dug trench (5363270595).jpg 1,932 × 2,576; 1.9 MB
-
Plastic buckets used as waterless boys urinals (5051360302).jpg 4,288 × 2,848; 2.67 MB
-
Plastic urine pump (5447331737).jpg 383 × 288; 24 KB
-
Plastic urine pump used by a pupil (5447935446).jpg 620 × 828; 76 KB
-
Ploughed school vegetable patch (4358855531).jpg 2,592 × 1,944; 1.61 MB
-
Poster compitition photo 022 (4812301002).jpg 640 × 480; 98 KB
-
Poster compitition photo 023 (4811676131).jpg 640 × 480; 88 KB
-
Poster compitition photo 076 (4811676609).jpg 2,816 × 2,112; 1.65 MB
-
Poster compitition photo 078 (4812301606).jpg 2,816 × 2,112; 1.27 MB