Category:Pomona Ramp
Jump to navigation
Jump to search
English: Pomona Ramp, on the Manchester Metrolink Trafford Park Line, connects the line to/from Wharfside Metrolink station to the Pomona Strand Viaduct. It opened on 22 March 2020.
Media in category "Pomona Ramp"
The following 11 files are in this category, out of 11 total.
-
POM10.jpg 3,264 × 2,448; 1.42 MB
-
POM8.jpg 3,264 × 2,448; 1.81 MB
-
POM9.jpg 3,264 × 2,448; 1.39 MB
-
Pomona Ramp, April 2020 (01).jpg 2,560 × 1,920; 2.58 MB
-
Pomona Ramp, April 2020 (03).jpg 2,560 × 1,920; 2.74 MB
-
Pomona Ramp, April 2020 (04).jpg 1,920 × 2,560; 2.87 MB
-
Pomona Ramp, April 2020 (05).jpg 2,560 × 1,920; 2.68 MB
-
Pomona Ramp, April 2020 (06).jpg 2,560 × 1,920; 2.77 MB
-
Pomona Ramp, April 2020 (07).jpg 2,560 × 1,920; 2.64 MB
-
Pomona Ramp, April 2020 (08).jpg 2,560 × 1,920; 2.61 MB
-
Pomona Strand Viaduct, April 2020 (02).jpg 2,560 × 1,920; 2.76 MB