Category:Parcel 12 construction
Jump to navigation
Jump to search
Media in category "Parcel 12 construction"
The following 16 files are in this category, out of 16 total.
-
Green Line vent structure west of Massachusetts Avenue, July 2021.jpg 3,127 × 2,344; 3.29 MB
-
Hynes station pedestrian tunnel exposed during Parcel 12 construction, July 2021.JPG 2,023 × 1,517; 630 KB
-
Parcel 12 construction from Boylston Street, July 2021.jpg 4,032 × 3,024; 6.85 MB
-
Parcel 12 construction from the west (1), July 2021.JPG 4,958 × 3,721; 3.35 MB
-
Parcel 12 construction from the west (2), July 2021.JPG 5,184 × 3,888; 3.23 MB
-
Boylston Street Subway vent and Parcel 12 construction, December 2021.JPG 5,184 × 3,888; 8.54 MB
-
Parcel 12 construction from Boylston Street (1), December 2021.JPG 5,184 × 3,888; 6.95 MB
-
Parcel 12 construction from Boylston Street (2), December 2021.JPG 5,184 × 3,888; 8.29 MB
-
Temporary track crossing for Parcel 12 construction, December 2021.JPG 5,184 × 3,888; 8.59 MB
-
MBTA entrance in Parcel 12 construction, September 2022.JPG 4,111 × 3,085; 4.68 MB
-
Parcel 12 construction from Dalton Street, September 2022.JPG 4,471 × 3,354; 6.16 MB
-
Parcel 12 construction from Mass Ave, September 2022.jpg 3,024 × 4,032; 3.72 MB
-
Former pedestrian tunnel entrance in Hynes station lobby, December 2022.jpg 4,032 × 3,024; 3.4 MB
-
Parcel 12 construction (1), December 2022.JPG 5,184 × 3,888; 7.71 MB
-
Parcel 12 construction (2), December 2022.jpg 3,024 × 4,032; 2.95 MB
-
Boylston Street at Jersey Street, February 2022.jpg 6,016 × 4,016; 5.09 MB