Category:New construction of 5 bridges on the german railway line ELSt/6375 in Leipzig in September 2020
Jump to navigation
Jump to search
Media in category "New construction of 5 bridges on the german railway line ELSt/6375 in Leipzig in September 2020"
The following 3 files are in this category, out of 3 total.
-
Baustelle am Haltepunkt Leipzig-Anger-Crottendorf-1.jpg 5,756 × 3,850; 20.69 MB
-
Baustelle am Haltepunkt Leipzig-Anger-Crottendorf-2.jpg 5,686 × 3,917; 17.09 MB
-
Hp Leipzig-Anger-Crottendorf mit einfahrender S-Bahn.jpg 4,852 × 3,244; 16.66 MB