Category:Miraflores Locks expansion
Jump to navigation
Jump to search
New locks near Miraflores were built as part of the Panama Canal expansion project. The ACP named the new locks "Cocolí"
Media in category "Miraflores Locks expansion"
The following 9 files are in this category, out of 9 total.
-
Construccion nueva esclusa Cocoli Panama 07 2015 4271.jpg 2,400 × 1,600; 5.36 MB
-
Container ship entering the new Cocoli locks of the Panama Canal.jpg 4,474 × 2,067; 1,013 KB
-
Hydraulic Excavation, Miraflores. Monitors in Oberation, December 21, 1910 LCCN2016870855.jpg 10,220 × 8,114; 8.49 MB
-
Miraflores 03 2015 new third set locks 1411.JPG 3,508 × 1,600; 4.91 MB
-
Miraflores 03 2015 new third set locks 1412.JPG 3,429 × 1,800; 5.67 MB
-
Miraflores 03 2015 new third set locks 1416.JPG 4,570 × 1,600; 6.08 MB
-
Miraflores 03 2015 new third set locks 1418.JPG 3,600 × 2,400; 5.84 MB
-
Nueva esclusa Cocori Panama 07 2015 4268.jpg 2,404 × 1,600; 5.3 MB
-
Third Locks Miraflores Panama 07 2015 4269.jpg 3,995 × 1,600; 7.61 MB