Category:Hydrodemolition of Division 11 Bridge
Jump to navigation
Jump to search
Media in category "Hydrodemolition of Division 11 Bridge"
The following 83 files are in this category, out of 83 total.
-
Another type of expansion joint at bridge approach prior to project.jpg 1,728 × 2,304; 1.54 MB
-
Another view of completed hydrodemolition area.jpg 1,728 × 2,304; 1.41 MB
-
Another view of containment vehicles.jpg 3,648 × 2,736; 2.01 MB
-
Another view of damaged rebar.jpg 1,600 × 1,200; 670 KB
-
Another view of expansion joint at bridge approach prior to project.jpg 1,728 × 2,304; 1.43 MB
-
Another view of expansion joint at with joint material removed.jpg 3,648 × 2,736; 3.28 MB
-
Another view of header at expansion joint.jpg 3,648 × 2,736; 3.02 MB
-
Another view of hydrodemolition ops in progress.jpg 3,648 × 2,736; 2.87 MB
-
Another view of lifting the slump cone.jpg 3,648 × 2,736; 2.46 MB
-
Another view of mobile mixer loading.jpg 3,648 × 2,736; 2.35 MB
-
Another view of placing ops (1).jpg 3,648 × 2,736; 3.11 MB
-
Another view of placing ops - 8671545761.jpg 3,648 × 2,736; 2.66 MB
-
Another view of placing ops approaching an expansion joint.jpg 3,648 × 2,736; 2.55 MB
-
Another view of placing ops.jpg 3,648 × 2,736; 2.29 MB
-
Another view of screed and rail setup for one lane placing ops.jpg 3,648 × 2,736; 2.6 MB
-
Another view of screed finishing.jpg 3,648 × 2,736; 2.76 MB
-
Another view of slurry dumping ops.jpg 3,648 × 2,736; 2.27 MB
-
Another view of the Bidwell screed used on this project.jpg 3,648 × 2,736; 3.44 MB
-
Another view of the double pump hydrodemolition setup.jpg 3,648 × 2,736; 2.71 MB
-
Another view of the screed and rail setup.jpg 3,648 × 2,736; 3.08 MB
-
Another view of waste dumping ops.jpg 3,648 × 2,736; 2.07 MB
-
Armor plated bridge joint.jpg 1,728 × 2,304; 1.33 MB
-
Beginning placing ops.jpg 3,648 × 2,736; 2.65 MB
-
Bridge expansion joint with joint material removed.jpg 3,648 × 2,736; 3.17 MB
-
Bridge pick points exposed during hydrodemolition ops.jpg 240 × 320; 37 KB
-
Bridge work used for placing wet burlap curing material behind screed.jpg 3,648 × 2,736; 2.43 MB
-
Calibration a mobile concrete mixer.jpg 2,736 × 3,648; 1.98 MB
-
Class I and II repair areas.jpg 3,648 × 2,736; 3.49 MB
-
Class II repair area prior to hydrodemolition.jpg 3,648 × 2,736; 3.1 MB
-
Class II repairs located during hydrodemolition ops.jpg 3,648 × 2,736; 3.52 MB
-
Close up of deck surface after hydrodemolitioned ops.jpg 3,648 × 2,736; 3.16 MB
-
Concrete placing ops.jpg 3,648 × 2,736; 3.5 MB
-
Deck elevations being checked after milling ops.jpg 1,600 × 1,200; 754 KB
-
Defective concrete located in wheel path on Bridge -14 in Caldwell County.jpg 1,200 × 1,600; 674 KB
-
DOT project technicians performing slump test on latex concrete.jpg 3,648 × 2,736; 2.39 MB
-
Dumping hydrodemolition solids.jpg 3,648 × 2,736; 2.14 MB
-
Dumping slurry and soild waste generated by hydrodemolition ops.jpg 3,648 × 2,736; 2.23 MB
-
Equipment used to determine sand and stone moisture content during calibration ops.jpg 3,648 × 2,736; 2.61 MB
-
Expansion joint at bridge approach prior to project.jpg 1,728 × 2,304; 1.55 MB
-
Expansion joint at bridge span prior to project.jpg 1,728 × 2,304; 1.22 MB
-
Exposed rebar on bridge deck prior to project ops.jpg 2,304 × 1,728; 1.48 MB
-
Hand finishing gutterline area outside screed path.jpg 3,648 × 2,736; 2.69 MB
-
Header material being placed at expansion joint in advance of concrete placing.jpg 3,648 × 2,736; 2.94 MB
-
Hydrodemolition ops include waste water and slurry containment.jpg 3,648 × 2,736; 2.88 MB
-
Hydrodemolition ops including robot mounted and handheld vaccum hoses.jpg 3,648 × 2,736; 2.77 MB
-
Hydrodemolition robot with water supply lines and vaccum hoses attached.jpg 1,600 × 1,200; 718 KB
-
Hydrodemolitioned deck surface, screed rail, plugged deck drains.jpg 3,648 × 2,736; 3.23 MB
-
Hydrodemolitioned surface prior to final pressure wash and vaccum.jpg 3,648 × 2,736; 3.75 MB
-
Inspecting milling machine cutting head.jpg 1,600 × 1,200; 754 KB
-
Latex concrete testing by DOT project technicians.jpg 3,648 × 2,736; 2.57 MB
-
Lifting the slump cone.jpg 3,648 × 2,736; 2.3 MB
-
Loading mobile mixer with sand, stone, cement, water and latex.jpg 3,648 × 2,736; 2.58 MB
-
Making concrete cylinders.jpg 3,648 × 2,736; 2.59 MB
-
Measuring the actual slump.jpg 3,648 × 2,736; 2.54 MB
-
Milling on Bridge -14 in Caldwell County.jpg 1,600 × 1,200; 568 KB
-
Mobile concrete mixer used for latex overlay.jpg 3,648 × 2,736; 2.29 MB
-
Partial view of a double pump hydrodemolition setup.jpg 3,648 × 2,736; 2.84 MB
-
Partial view of hydrodemolition pump system.jpg 1,600 × 1,200; 624 KB
-
Partial view of hydrodemolition robot.jpg 1,200 × 1,600; 656 KB
-
Pile of hydrodemolitioned solids.jpg 640 × 480; 47 KB
-
Pile of solid waste generated by hydrodemolition ops.jpg 3,648 × 2,736; 1.61 MB
-
Rear view of mobile mixer.jpg 3,648 × 2,736; 2.15 MB
-
Rebar damaged during milling ops.jpg 3,648 × 2,736; 3.25 MB
-
Removing defective concrete by jackhammering.jpg 3,648 × 2,736; 3.09 MB
-
Resident Engineer David Poindexter observing placing ops.jpg 3,648 × 2,736; 2.44 MB
-
Screed finishing ops.jpg 3,648 × 2,736; 3.09 MB
-
Screed rail setup components.jpg 3,648 × 2,736; 3.56 MB
-
Screed rail setup for placing latex on one lane of this bridge.jpg 3,648 × 2,736; 3.01 MB
-
Screed used to mechanically finish latex overlay.jpg 3,648 × 2,736; 2.85 MB
-
Setting Up Traffic Control for Bridge -14 - Latex Overlay Project in Caldwell County.jpg 1,600 × 1,200; 493 KB
-
Strike off step during slump test.jpg 3,648 × 2,736; 2.13 MB
-
The business end of a mobile concrete mixer.jpg 3,648 × 2,736; 2.26 MB
-
There is about a foot deep layer of material still left in the bottom of the tank.jpg 3,648 × 2,736; 2.53 MB
-
Typical deck surface after hydro demo ops.jpg 3,648 × 2,736; 3.8 MB
-
View of completed hydroed deck surface.jpg 2,304 × 1,728; 1.46 MB
-
View of Rebar Damaged during Milling Ops.jpg 1,600 × 1,200; 586 KB
-
View of slump prior to measuring.jpg 3,648 × 2,736; 2.35 MB
-
View of waste water and slurry containment vehicles.jpg 3,648 × 2,736; 1.98 MB
-
Water supply for hydrodemolition ops.jpg 3,648 × 2,736; 2.49 MB
-
Weighing materials during calibration ops.jpg 3,648 × 2,736; 2.49 MB