Category:Hengyang-Liuzhou Railway

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search
中文:衡柳铁路
<nowiki>Hengyang–Liuzhou railway; 衡柳線; 衡柳铁路; railway line between Hunan and Guangxi, completed in 2013; خط سكة حديد في الصين; 中国的一条铁路; 衡柳线</nowiki>
Hengyang–Liuzhou railway 
railway line between Hunan and Guangxi, completed in 2013
Upload media
Instance of
Part of
  • Hohhot–Nanning passageway
Location
Connects with
Operator
Date of official opening
  • 28 December 2013
Length
  • 497.9 km
Terminus
Authority file
Edit infobox data on Wikidata

Media in category "Hengyang-Liuzhou Railway"

The following 60 files are in this category, out of 60 total.