Category:Goomalling to Mullewa railway line

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search
English: The Goomalling to Mullewa railway line was built in stages. The first section, between Goomalling and Wongan Hills, was opened in 1911. The rest of the line, between Wongan Hills and Mullewa was built between 1912 and 1915, and passed through Ballidu, Dalwallinu, Perenjori and Morawa. As of 2016, the section between McLevie, just north of Dallwallinu, and Perenjori was no longer in operation.

Subcategories

This category has the following 9 subcategories, out of 9 total.