Category:GSLV-F08
Jump to navigation
Jump to search
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Location |
| ||||
Operator | |||||
Start point | |||||
Space launch vehicle |
| ||||
UTC date of spacecraft launch |
| ||||
Significant event | |||||
| |||||
Media in category "GSLV-F08"
The following 25 files are in this category, out of 25 total.
-
A view of the Umbilical Tower of the Second Launch Pad with GSLV-F08 in the background.jpg 2,456 × 3,680; 1.15 MB
-
Cryogenic Upper Stage Integration under Progress.jpg 2,456 × 3,680; 1.09 MB
-
Full view of GSLV-F08 on Mobile Launch Pedestal proceeding towards the Umbilical Tower.jpg 2,456 × 3,680; 1.22 MB
-
Fully Integrated GSLV-F08 inside the Vehicle Assembly Building.jpg 3,680 × 2,456; 1.19 MB
-
GSLV-F08 at the Umbilical Tower of the Second Launch Pad.jpg 1,459 × 2,189; 557 KB
-
GSLV-F08 Heat-shield is being closed with GSAT-6A Satellites inside.jpg 2,456 × 3,680; 969 KB
-
GSLV-F08 Liftoff 2.jpg 1,643 × 1,093; 312 KB
-
GSLV-F08 Liftoff 3.jpg 907 × 1,365; 195 KB
-
GSLV-F08 Liftoff 4.jpg 1,643 × 1,093; 362 KB
-
GSLV-F08 Liftoff 5.jpg 2,533 × 3,800; 848 KB
-
GSLV-F08 Liftoff 6.jpg 3,680 × 2,456; 1.27 MB
-
GSLV-F08 Liftoff 7.jpg 2,533 × 3,800; 864 KB
-
GSLV-F08 Liftoff 8.jpg 1,223 × 1,764; 237 KB
-
GSLV-F08 Liftoff 9.jpg 2,533 × 3,800; 974 KB
-
GSLV-F08 Liftoff.jpg 1,700 × 1,179; 437 KB
-
GSLV-F08 on the Mobile Launch Pedestal emerging from Vehicle Assembly Building.jpg 1,965 × 2,944; 1.02 MB
-
GSLV-F08 Strap-ons Integration with Core Stage is in Progress.jpg 1,351 × 2,024; 966 KB
-
Hoisting of Cryogenic Upper Stage during Vehicle Integration.jpg 1,888 × 2,837; 1.12 MB
-
Hoisting of Second (Liquid) Stage during Vehicle Integration.jpg 2,880 × 1,920; 1.29 MB
-
Nozzle End Segment of GSLV-F08 Core Stage being placed on the Mobile Launch Pedestal.jpg 1,416 × 2,128; 867 KB
-
Pade02.jpg 907 × 1,365; 734 KB
-
Payload Fairing with GSAT-6A being Integrated.jpg 2,456 × 3,680; 1.41 MB