Category:East Side Access construction/2019/12/20
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/12/20"
The following 19 files are in this category, out of 19 total.
-
Drilling mini piles for the Eastbound Reroute in Harold Interlocking. (49248066393).jpg 1,512 × 2,016; 1.01 MB
-
Excavating material between tracks at the future Mid-Day Storage Yard. (49248532766).jpg 1,512 × 2,016; 1.03 MB
-
Installing a staircase in the future LIRR terminal. (49248739782).jpg 4,032 × 3,024; 2.26 MB
-
Installing electrical equipment for the Mid-Day Storage Yard. (49248532801).jpg 1,512 × 2,016; 1.04 MB
-
Installing stone panels in the future LIRR concourse. (49248739677).jpg 3,264 × 2,448; 1.94 MB
-
Layout and installation of fire standpipes in Queens. (49248739622).jpg 4,608 × 3,456; 3.41 MB
-
Loading a drill rig onto a work train by the 39th Street Bridge in Queens. (49248533186).jpg 3,024 × 4,032; 2.29 MB
-
Loading trucks with debris at the future Mid-Day Storage Yard. (49248066358).jpg 3,514 × 1,977; 1.98 MB
-
Pouring foundation in the future Mid-Day Storage Yard. (49248532761).jpg 1,512 × 2,016; 1.11 MB
-
Removing a fence post at the future Mid-Day Storage Yard. (49248532786).jpg 1,512 × 2,016; 1,011 KB