Category:East Side Access construction/2019/12/06
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/12/06"
The following 28 files are in this category, out of 28 total.
-
Installing ceiling finishes in the future LIRR concourse. 12-04-2019 (49180033682).jpg 4,032 × 3,024; 1.37 MB
-
Installing trough at Harold Interlocking. 11-15-2019 (49179335108).jpg 2,400 × 1,728; 1.04 MB
-
Setting up the switch gear in the power meter room in Queens. 12-03-2019 (49179335348).jpg 4,608 × 3,456; 7.83 MB
-
Stairway installation in the future LIRR Terminal. 11-25-2019 (49179826806).jpg 4,032 × 3,024; 3.81 MB