Category:East Side Access construction/2019/08/16
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/08/16"
The following 29 files are in this category, out of 29 total.
-
Cleaning the bench of the Yard Lead Tunnel. (CS179, 08-13-2019) (48552632026).jpg 4,608 × 3,456; 3.36 MB
-
Track heaters installed in Harold Interlocking. (ESA LIRR, 08-14-2019) (48552780192).jpg 1,000 × 1,432; 670 KB