Category:East Side Access construction/2019/08/09
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/08/09"
The following 26 files are in this category, out of 26 total.
-
Backfilling the walkway adjacent to tracks east of Thomson Ave. 08-05-2019 (48497492152).jpg 1,512 × 2,016; 1.42 MB
-
Grading ballast over new conduit trough in Harold Interlocking. 08-05-2019 (48497492017).jpg 2,600 × 1,872; 1.08 MB