Category:East Side Access construction/2018/12/21
Jump to navigation
Jump to search
Media in category "East Side Access construction/2018/12/21"
The following 23 files are in this category, out of 23 total.
-
Installing doors in the east cavern. (CM007, 12-18-2018) (46357137602).jpg 4,608 × 3,456; 4.52 MB
-
Passenger elevator installation in the east cavern. (CM007, 12-18-2018) (46357137272).jpg 4,032 × 3,024; 3.46 MB
-
Temporary partitions installed in the Biltmore Room. (CM014B, 12-17-2018) (46357137872).jpg 3,264 × 2,448; 1.22 MB