Category:East Side Access construction/2018/08/24
Jump to navigation
Jump to search
Media in category "East Side Access construction/2018/08/24"
The following 25 files are in this category, out of 25 total.
-
Escalator pit in the future LIRR concourse. (CM014B, 08-22-18) (30376179608).jpg 2,016 × 1,512; 1.05 MB
-
Platform slab deck installed in the east cavern. (CM007, 8-21-2018) (30376178168).jpg 4,032 × 3,024; 3.76 MB
-
Precast platform walls installed in the east cavern. (CM007, 8-20-2018) (43337512455).jpg 4,032 × 3,024; 3.32 MB
-
Precast platform walls installed in the east cavern. (CM007, 8-21-2018) (44243158441).jpg 3,024 × 4,032; 3.13 MB
-
Repairing rail in the east cavern tail tracks. (CM007, 8-23-2018) (43337512805).jpg 3,024 × 3,023; 1.69 MB
-
Steel escalator enclosure installed in the west cavern. (CM007, 8-23-2018) (30376177958).jpg 3,024 × 4,032; 2.21 MB
-
Steel escalator enclosure installed in the west cavern. (CM007, 8-23-2018) (44243157911).jpg 4,032 × 3,024; 4.11 MB