Media in category "East Side Access construction/2018/08/17"
The following 26 files are in this category, out of 26 total.
-
Conduit installation under the west cavern platform. (CM007, 8-15-2018) (44097308511).jpg 4,288 × 3,216; 4.02 MB
-
Excavation for a trench box west of Queens Boulevard. (CQ033, 08-16-2018) (44048208672).jpg 1,512 × 2,016; 1.13 MB
-
Installing a switch panel in Harold Interlocking. (ESA LIRR, 08-10-2018) (42287723550).jpg 2,988 × 1,968; 1.03 MB
-
Lower level rail alignment in the east cavern. (CM007, 8-13-2018) (44048203572).jpg 3,024 × 4,032; 1.4 MB
-
Unloading the east cavern steel passenger stairway. (CM007, 8-13-2018) (44048220912).jpg 3,024 × 4,032; 2.59 MB
-
Welding the steel frame of the east cavern elevator. (CM007, 8-13-2018) (44048223542).jpg 3,024 × 4,032; 2.81 MB