Category:East Side Access construction/2018/04/27
Jump to navigation
Jump to search
Media in category "East Side Access construction/2018/04/27"
The following 31 files are in this category, out of 31 total.
-
Electrical conduit formwork at the Express Level. (CM014B, 4-23-2018) (41474441614).jpg 4,032 × 3,024; 2.13 MB
-
Elevator shaft formwork. (CM014B, 4-24-2018) (42149187642).jpg 3,264 × 2,448; 1.09 MB
-
Installation of the roof slab waterproofing. (CH061A, 4-23-2018) (41295100105).jpg 2,016 × 1,512; 880 KB
-
New Main Line 4 Track (FHL02, 4-23-2018) (27324271687).jpg 2,782 × 2,004; 1.28 MB
-
Removal of formwork at an elevator shaft. (CM014B, 4-24-2018) (42149187672).jpg 4,032 × 3,024; 2.08 MB