Category:Crown Street cutting 2018
Jump to navigation
Jump to search
Object location | View all coordinates using: OpenStreetMap |
---|
At the beginning of 2018 a new western wall was built on Crown Street cutting as part of the Liverpool Lime Street Re-signalling & Re-modelling Project. The electrical overhead lines are being refurbished along the length of the Lime Street tunnel.
Media in category "Crown Street cutting 2018"
The following 4 files are in this category, out of 4 total.
-
Crown Street cutting 2018 1.jpg 5,184 × 3,456; 9.02 MB
-
Crown Street cutting 2018 2.jpg 5,184 × 3,456; 8.23 MB
-
Crown Street cutting 2018 3.jpg 5,184 × 3,456; 6.51 MB
-
Crown Street cutting 2018 4.jpg 4,846 × 3,328; 9.05 MB