Category:Construction of the Grand Coulee Dam
Jump to navigation
Jump to search
Media in category "Construction of the Grand Coulee Dam"
The following 200 files are in this category, out of 376 total.
(previous page) (next page)-
"East side excavation area." - NARA - 294002.jpg 3,000 × 2,345; 1.31 MB
-
"East tower of suspension bridge for sand and gravel conveyor." - NARA - 294024.jpg 2,424 × 3,000; 731 KB
-
"Pouring an approach bent, west side of highway bridge." - NARA - 293973.jpg 2,440 × 3,000; 708 KB
-
"Pouring concrete column supports for the west mixing plant." - NARA - 294068.jpg 2,191 × 3,000; 934 KB
-
"Preparing block 40-J for concrete." - NARA - 294189.jpg 3,000 × 2,384; 1,009 KB
-
"Putting down steel sheet piling in cofferdam cells." - NARA - 294133.jpg 2,133 × 3,000; 480 KB
-
"Re-setting a conveyor feeder on the east side." - NARA - 294093.jpg 3,000 × 2,428; 1.14 MB
-
"Ready for grout pour at block 40-H." - NARA - 294190.jpg 3,000 × 2,229; 649 KB
-
"Rebuilding cell F-6." - NARA - 294352.jpg 3,000 × 2,262; 929 KB
-
"Roller bearings for belt conveyor leaving gravel screening plant." - NARA - 294131.jpg 2,120 × 3,000; 889 KB
-
"Sand and gravel dewatering equipment." - NARA - 293964.jpg 3,000 × 2,315; 1.24 MB
-
"Section of Grand Coulee, Wash., boom town near Grand Coulee Dam." - NARA - 294114.jpg 3,000 × 2,145; 608 KB
-
"Some of the 40 four-yard concrete buckets." - NARA - 294071.jpg 3,000 × 2,322; 839 KB
-
"Spreading mortar over the bedrock." - NARA - 294149.jpg 2,427 × 3,000; 744 KB
-
"Squad of C.C.C. boys at work on landscape development, government town." - NARA - 294117.jpg 3,000 × 2,096; 1,013 KB
-
"Steamboat Rock, a landmark in Grand Coulee." - NARA - 294040.jpg 3,000 × 2,118; 543 KB
-
"Substructure for mixing plant and placing trestles, west side." - NARA - 294145.jpg 2,316 × 3,000; 730 KB
-
"Terminus of belt conveyor system in Rattlesnake Canyon." - NARA - 294116.jpg 3,000 × 2,087; 570 KB
-
"Terminus of belt conveyor system in Rattlesnake Canyon." - NARA - 294119.jpg 2,121 × 3,000; 725 KB
-
"The Calyx 36" core drilling rig." - NARA - 293990.jpg 2,441 × 3,000; 777 KB
-
"The Eastmix concrete plant under construction." - NARA - 294301.jpg 2,430 × 3,000; 1.07 MB
-
"The west vista house, provided for visitors to Grand Coulee Dam." - NARA - 294348.jpg 3,000 × 2,361; 1,011 KB
-
"Threading a steel pile in one of the 'block 40' closure cells." - NARA - 294079.jpg 2,446 × 3,000; 614 KB
-
"Tractor powered scrapers removing top soil from gravel pit." - NARA - 294104.jpg 3,000 × 2,143; 479 KB
-
"Tractor skinner." - NARA - 294213.jpg 3,000 × 2,130; 500 KB
-
"Transfer point on belt conveyor system." - NARA - 294120.jpg 3,000 × 2,128; 750 KB
-
"Trestle bridge carrying conveyor belt over Columbia River." - NARA - 294102.jpg 3,000 × 2,154; 623 KB
-
"Typical C.C.C. enrollee." - NARA - 294132.jpg 2,119 × 3,000; 615 KB
-
"Typical section of belt conveyor." - NARA - 294122.jpg 3,000 × 2,140; 1.03 MB
-
"Under the trusses in 'block 40'. - NARA - 294048.jpg 3,000 × 2,354; 1,015 KB
-
"Upstream view of block 40 taken from west bank conveyor tower." - NARA - 294188.jpg 2,342 × 3,000; 1.15 MB
-
"View looking east from the Westmix trestle showing concrete blocks." - NARA - 294235.jpg 3,000 × 2,328; 1.22 MB
-
"View looking west across the west dam and power-house area." - NARA - 294322.jpg 3,000 × 2,328; 1.44 MB
-
"View looking west of the east approach to Government Highway Bridge." - NARA - 294199.jpg 3,000 × 2,336; 1.03 MB
-
"View of bedrock and concrete poured section of west bank area." - NARA - 294187.jpg 3,000 × 2,343; 1.22 MB
-
"View of east bank area from west bank." - NARA - 294191.jpg 3,000 × 2,195; 806 KB
-
"View of excavation operations on berm west of block 40." - NARA - 294302.jpg 3,000 × 2,319; 942 KB
-
"View of west bank area from top of forebay slope at west abutment." - NARA - 294184.jpg 3,000 × 2,354; 1.23 MB
-
A close-up of trusses in 'block 40' - NARA - 294055.jpg 3,000 × 2,329; 948 KB
-
A close-up view of a five-yard dipper on electric shovel - NARA - 294280.jpg 2,420 × 3,000; 722 KB
-
A close-up view of drillers - NARA - 294287.jpg 2,432 × 3,000; 653 KB
-
A detail view of forms for block pours - NARA - 294329.jpg 2,342 × 3,000; 1.07 MB
-
A downstream two-view progression picture showing the west bank area - NARA - 294181.jpg 3,000 × 2,331; 1.14 MB
-
A downstream two-view progression picture showing the west bank area - NARA - 294182.jpg 3,000 × 2,313; 1.07 MB
-
A five-yard dipper excavating in clay overburden - NARA - 294281.jpg 3,000 × 2,444; 809 KB
-
A four-view panorama of east excavation area from east bank cofferdam - NARA - 294195.jpg 3,000 × 2,292; 1,011 KB
-
A four-view panorama of east excavation area from east bank cofferdam - NARA - 294197.jpg 3,000 × 2,341; 1.02 MB
-
A four-view panorama of east excavation area from east bank cofferdam - NARA - 294198.jpg 3,000 × 2,302; 1.01 MB
-
A four-yard bucket of mortar being dumped on bedrock - NARA - 294148.jpg 2,454 × 3,000; 631 KB
-
A general view of the slide on the east forebay slope - NARA - 294314.jpg 3,000 × 2,341; 1.4 MB
-
A group of concrete blocks near the east end of the dam - NARA - 294349.jpg 3,000 × 2,345; 1.13 MB
-
A panorama of the west side - NARA - 293980.jpg 3,000 × 2,295; 1.05 MB
-
A panorama of the west side - NARA - 293981.jpg 3,000 × 2,280; 1.07 MB
-
A panorama of the west side - NARA - 293982.jpg 3,000 × 2,311; 1.06 MB
-
A part of the west abutment - NARA - 294077.jpg 2,420 × 3,000; 1.38 MB
-
A portable crane-car handling form panels - NARA - 294325.jpg 2,414 × 3,000; 958 KB
-
A portion of block P4B ready for concrete - NARA - 294216.jpg 3,000 × 2,142; 1 MB
-
A scene in the east side excavation area - NARA - 294050.jpg 2,336 × 3,000; 1.12 MB
-
A slide on the east forebay slope - NARA - 294095.jpg 3,000 × 2,412; 1.54 MB
-
A slide on west end of east forebay slope - NARA - 294070.jpg 3,000 × 2,175; 1.22 MB
-
A three-view panorama of the development from top of east abutment - NARA - 294204.jpg 3,000 × 2,283; 997 KB
-
A three-view panorama of the development from top of east abutment - NARA - 294205.jpg 3,000 × 2,265; 1.25 MB
-
A three-view panorama of the development from top of east abutment - NARA - 294206.jpg 3,000 × 2,259; 903 KB
-
A view of the south end of the east slope - NARA - 293975.jpg 3,000 × 2,334; 1.35 MB
-
An electric welder - NARA - 293969.jpg 3,000 × 2,407; 625 KB
-
Area between blocks 31 and 40, lower one-half of dam foundation - NARA - 294330.jpg 3,000 × 2,325; 1.39 MB
-
Area between blocks 31 and 40, upper one-half of dam foundation - NARA - 294331.jpg 3,000 × 2,336; 1.41 MB
-
Arranging wind bracing for suspension bridge - NARA - 294022.jpg 2,453 × 3,000; 592 KB
-
Arranging wind bracing for suspension bridge - NARA - 294023.jpg 3,000 × 2,471; 722 KB
-
Bedrock exposed in block 40, with heavy timber bracing overhead - NARA - 294155.jpg 3,000 × 2,090; 604 KB
-
Bedrock for the west end of the dam - NARA - 293988.jpg 3,000 × 2,209; 1.18 MB
-
Bedrock for the west end of the dam with upstream slope in the distance - NARA - 293989.jpg 3,000 × 2,181; 1.06 MB
-
Bedrock formation in block 24-E - NARA - 294237.jpg 3,000 × 2,424; 1.18 MB
-
Bedrock in block 12G prepared for concrete - NARA - 294152.jpg 3,000 × 2,355; 628 KB