Category:25 kV AC overhead lines
Jump to navigation
Jump to search
Subcategories
This category has the following 3 subcategories, out of 3 total.
F
R
U
Media in category "25 kV AC overhead lines"
The following 72 files are in this category, out of 72 total.
-
2016 at Gatehampton Bridge - electrification portal fixed to pier.JPG 1,024 × 1,366; 879 KB
-
2016 at Moulsford Bridge - electrification mast.JPG 1,366 × 910; 464 KB
-
2016 at Pangbourne station - electrification masts.JPG 1,024 × 1,366; 813 KB
-
2016 at Taplow station - new electrification masts.JPG 1,366 × 910; 451 KB
-
2017 at Falkirk High - tunnel west portal.JPG 1,366 × 910; 733 KB
-
2017 at Twyford station - electrification works (2).JPG 1,366 × 910; 564 KB
-
2017 at Twyford station - electrification works (3).JPG 1,366 × 910; 592 KB
-
2017 at Twyford station - electrification works (4).JPG 1,366 × 910; 812 KB
-
2021 at Taplow - platform 3.JPG 1,366 × 910; 546 KB
-
25 kV AC, Watlington.jpeg 2,160 × 1,440; 988 KB
-
AC kiden system.png 1,364 × 784; 21 KB
-
2019 at Alloa station - trains stop here.JPG 1,366 × 910; 556 KB
-
Anc. lig Paris-Bxl (B).jpg 1,136 × 852; 215 KB
-
Anc. ligne Paris-Bxl, Quévy (B).jpg 1,136 × 852; 244 KB
-
Ayr Viaduct - Abellio 380011 arriving from Glasgow.JPG 1,366 × 910; 570 KB
-
Beyer Peacock Type 2 D5079 (8273353054).jpg 786 × 540; 258 KB
-
Block and tacle pulley system.jpg 1,456 × 2,592; 1.26 MB
-
Catenaire 25KV Mersch.JPG 3,648 × 2,736; 4.84 MB
-
Cimenteiro rumo a Leandro (5044045836).jpg 3,321 × 2,310; 1.31 MB
-
CP 2600 e faiscas (4968241575).jpg 3,148 × 2,478; 1.02 MB
-
CP 2601 a cargo do cimenteiro (5085068530).jpg 3,340 × 2,592; 1.96 MB
-
Didcot - GWR 800013 at the end of the wire.JPG 1,366 × 820; 259 KB
-
Dunblane - Abellio 385106 shunting.JPG 1,366 × 910; 601 KB
-
East Guildford Station, Western Australia, December 2022 46.jpg 4,032 × 3,024; 2.42 MB
-
EL 8078+8072견인 벌크시멘트 화물열차.JPG 5,280 × 3,520; 14.7 MB
-
Elten, željeznička postaja.jpg 6,936 × 9,248; 18.77 MB
-
Falkirk High - Abellio 170401 arriving from Edinburgh.JPG 1,366 × 910; 619 KB
-
Falkirk High - Abellio 170454 under the wires.JPG 1,366 × 910; 286 KB
-
Fazishatar.jpg 1,232 × 1,632; 580 KB
-
Felsovezetek 1.JPG 1,920 × 2,560; 1,011 KB
-
Gare Quévy (B), sud.jpg 1,136 × 852; 231 KB
-
Glasgow Queen Street - Abellio 156447 Anniesland departure.JPG 1,366 × 910; 839 KB
-
Glasgow Queen Street - NMT 43013.JPG 1,366 × 910; 752 KB
-
GyomroMende 208 209.jpg 2,686 × 1,237; 430 KB
-
Hest Bank - Arriva 156482 Windermere train.JPG 1,366 × 910; 371 KB
-
High voltage, Watlington.jpg 1,440 × 1,928; 1 MB
-
I10 887 Quertragwerk.jpg 4,248 × 2,832; 1.01 MB
-
J01 642 Fahrleitungsende.jpg 5,760 × 3,840; 3.75 MB
-
J01 643 Bf Blankenburg (Harz).jpg 5,760 × 3,840; 4.46 MB
-
J01 644 Bf Blankenburg (Harz).jpg 5,760 × 3,840; 4.1 MB
-
J35 985 Bf Ploče.jpg 5,601 × 3,734; 5.13 MB
-
J35 987 Einfachfahrleitung, Stützpunkt.jpg 5,607 × 3,738; 2.8 MB
-
Korail Class 8000 Wonju - Sillim.jpg 5,735 × 3,540; 5 MB
-
Manchester Victoria - TPE 185115 and Arriva 319383.JPG 1,366 × 910; 620 KB
-
Nagpur - Bhusawal SF Express.jpg 1,600 × 1,002; 1.18 MB
-
2019 at Newbury Racecourse station - footbridge (1).JPG 1,366 × 820; 487 KB
-
Orivesi-Jyväskylä railway in Muurame.jpg 2,048 × 1,536; 577 KB
-
Overhead line equipment on the West Coast Main Line, Shugborough.jpg 3,264 × 2,344; 3.78 MB
-
Pangbourne - CrossCountry 220s on the down releif.JPG 1,366 × 910; 582 KB
-
Postes LAC.jpg 617 × 1,170; 542 KB
-
Quai gare Quévy (B), nord.jpg 1,136 × 852; 248 KB
-
2021 at Reading West - view from the south.JPG 1,024 × 1,366; 459 KB
-
Reading West - GWR 387148 approaching from Newbury.JPG 1,366 × 1,024; 609 KB
-
Roofride kyiv.JPG 4,272 × 2,848; 4.16 MB
-
Spoorbrug Bredabaan 1.jpg 3,264 × 1,840; 2.66 MB
-
Spoorbrug Kapelsesteenweg 1.jpg 3,264 × 1,840; 2.69 MB
-
Spoorbrug Kapelsesteenweg 4.jpg 3,264 × 1,840; 2.79 MB
-
Stockport Viaduct - Virgin 390103 London service.JPG 1,366 × 910; 812 KB
-
Taplow - fGWR 165103 up train.JPG 1,366 × 1,024; 476 KB
-
Taplow - fGWR 43132-43069 under new electrification masts.JPG 1,366 × 910; 388 KB
-
Taplow - fGWR 43144 Building a Greater West.JPG 1,366 × 910; 693 KB
-
Taplow - fGWR 43191-43140 down train.JPG 1,366 × 910; 657 KB
-
2019 at Thatcham station - platform 1.JPG 1,366 × 910; 457 KB
-
Pangbourne - GWR 800309 down train.JPG 1,366 × 910; 695 KB
-
Thatcham - GWR 800028 Bedwyn service departing.JPG 1,366 × 1,024; 675 KB
-
Thatcham - GWR 802006 speeding westwards.JPG 1,366 × 910; 466 KB
-
THE westbound.jpg 4,032 × 3,024; 3.02 MB
-
Train Station - Flickr - anantal (3).jpg 1,632 × 1,224; 264 KB
-
V43 2311.jpg 2,000 × 1,500; 309 KB
-
Valburg, de Betuwelijn vanaf het spoorviadukt IMG 4003 2018-06-06 09.34.jpg 5,379 × 2,842; 10.82 MB
-
Ylivieska railway station 20070811.jpg 1,200 × 1,600; 744 KB