File:Working on the Hub of Turbine No 2 at Scout Moor - geograph.org.uk - 1008531.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Working_on_the_Hub_of_Turbine_No_2_at_Scout_Moor_-_geograph.org.uk_-_1008531.jpg(640 × 480 pixels, file size: 49 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Working on the Hub of Turbine No 2 at Scout Moor. The superstructure of Turbine Tower No 2 was completed on the 25th of April 2008 and is the most South Easterly of all the 26 turbine towers on Scout Moor.

Seen here in mid June 2008 an engineer was working on the turbine hub 60 metres from the ground as work continued with the finishing and commissioning work on the interior of the turbine.

Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.

On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm. Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.https://www.geograph.org.uk/photo/980311 Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"

Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."

854085 853447 696963 696211 824546 687214

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex

Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Working on the Hub of Turbine No 2 at Scout Moor / 
Paul Anderson / Working on the Hub of Turbine No 2 at Scout Moor
Camera location53° 38′ 48.8″ N, 2° 13′ 52″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 38′ 48.8″ N, 2° 13′ 52″ W  Heading=0° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:08, 23 February 2011Thumbnail for version as of 09:08, 23 February 2011640 × 480 (49 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Working on the Hub of Turbine No 2 at Scout Moor The superstructure of Turbine Tower No 2 was completed on the 25th of April 2008 and is the most South Easterly of all the 26 turbine towers on Scout

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata