File:W88 Alt 370 arming, fuzing, and firing assembly.png

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(820 × 612 pixels, file size: 288 KB, MIME type: image/png)

Captions

Captions

W88 Alt 370 arming, fuzing, and firing assembly

Summary[edit]

Description
English: The Department of Energy’s National Nuclear Security Administration (DOE/NNSA) successfully completed the system-level First Production Unit for the W88 Alteration (Alt) 370 at the Pantex Plant July 1, 2021.
Date
Source https://www.energy.gov/nnsa/articles/nnsa-completes-first-production-unit-w88-alteration-370
Author Department of Energy’s National Nuclear Security Administration (DOE/NNSA)

Licensing[edit]

Public domain This image is a work of a United States Department of Energy (or predecessor organization) employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

Please note that national laboratories operate under varying licences and some are not free. Check the site policies of any national lab before crediting it with this tag.


العربية  English  français  日本語  македонски  മലയാളം  Nederlands  русский  українська  Tiếng Việt  简体中文  繁體中文  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:40, 19 July 2021Thumbnail for version as of 17:40, 19 July 2021820 × 612 (288 KB)L'amateur d'aéroplanes (talk | contribs)Uploaded a work by Department of Energy’s National Nuclear Security Administration (DOE/NNSA) from https://www.thedefensepost.com/2021/07/15/us-nuclear-warhead/ with UploadWizard

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata