File:Training for On-Site Inspections (4-15 March 2013) (8569076226).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,736 × 3,648 pixels, file size: 5.85 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: The training covered the use of the active seismic system. This system is used during the continuation period of an on-site inspection. Its objective is to detect underground anomalies that have been observed from signals caused by artificial vibrations. A hammer or specially designed low-frequency vibrator is used to create the artificial vibrations (the active seismic equipment is an in-kind contribution from Hungary).
Date
Source Training for On-Site Inspections (4-15 March 2013)
Author M Prah\CTBTO

Licensing[edit]

w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image, originally posted to Flickr, was reviewed on 22 March 2014 by the administrator or reviewer FDMS4, who confirmed that it was available on Flickr under the stated license on that date.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:05, 22 March 2014Thumbnail for version as of 02:05, 22 March 20142,736 × 3,648 (5.85 MB)Russavia (talk | contribs)Transferred from Flickr

There are no pages that use this file.

Metadata