File:Slow progress with railway electrification (3), Newport Station (geograph 6011008).jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 450 pixels. Other resolutions: 320 × 180 pixels | 640 × 360 pixels | 1,024 × 576 pixels.
Original file (1,024 × 576 pixels, file size: 783 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionSlow progress with railway electrification (3), Newport Station (geograph 6011008).jpg |
English: Slow progress with railway electrification (3), Newport Station
A Great Western Railway electro-diesel multiple unit from London to Cardiff on platform 2. The electrification of the South Wales Mainline from London to Cardiff has been delayed and is now scheduled to be completed sometime in 2019. Gantries for the overhead cables have been erected but the wiring has yet to be completed. |
Date | |
Source | From geograph.org.uk |
Author | Robin Drayton |
Permission (Reusing this file) |
Creative Commons Attribution Share-alike license 2.0 |
Attribution (required by the license) InfoField | Robin Drayton / Slow progress with railway electrification (3), Newport Station / |
InfoField | Robin Drayton / Slow progress with railway electrification (3), Newport Station |
Camera location | 51° 35′ 20.1″ N, 3° 00′ 01″ W | View this and other nearby images on: OpenStreetMap | 51.588925; -3.000258 |
---|
Object location | 51° 35′ 21.1″ N, 2° 59′ 58″ W | View this and other nearby images on: OpenStreetMap | 51.589200; -2.999540 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Robin Drayton and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Robin Drayton
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 16:38, 8 January 2019 | 1,024 × 576 (783 KB) | Salen9 (talk | contribs) | Transferred from geograph.co.uk using [https://tools.wmflabs.org/geograph2commons/ geograph2commons] |
You cannot overwrite this file.
File usage on Commons
The following 7 pages use this file:
- User:Chumwa/OgreBot/Potential transport maps/2019 January 1-10
- User:Chumwa/OgreBot/Public transport information/2019 January 1-10
- User:Chumwa/OgreBot/Transport Maps/2019 January 1-10
- User:Chumwa/OgreBot/Travel and communication maps/2019 January 1-10
- User:Mattbuck/Railways/2019 January
- User:Nordlicht8/Rail Germany/2019 January 1-10
- User:OgreBot/Watercraft/2019 January 8
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | Motorola |
---|---|
Camera model | MotoE2(4G-LTE) |
Exposure time | 41/50,000 sec (0.00082) |
F-number | f/2.2 |
ISO speed rating | 50 |
Date and time of data generation | 10:32, 11 August 2018 |
Lens focal length | 2.471 mm |
Horizontal resolution | 72 dpi |
Vertical resolution | 72 dpi |
File change date and time | 10:32, 11 August 2018 |
Y and C positioning | Centered |
Exposure Program | Normal program |
Exif version | 2.2 |
Date and time of digitizing | 10:32, 11 August 2018 |
Meaning of each component |
|
APEX shutter speed | 10.24 |
APEX aperture | 2.275 |
APEX brightness | −1 |
APEX exposure bias | 0 |
Maximum land aperture | 2.275 APEX (f/2.2) |
Metering mode | Average |
Flash | Flash did not fire, No flash function |
DateTime subseconds | 471804 |
DateTimeOriginal subseconds | 471804 |
DateTimeDigitized subseconds | 471804 |
Supported Flashpix version | 1 |
Color space | sRGB |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Scene capture type | Standard |
Contrast | Normal |
Saturation | Normal |
Sharpness | Soft |
Geodetic survey data used | WGS-84 |
GPS tag version | 2.2.0.0 |
Structured data
Items portrayed in this file
depicts
some value
11 August 2018
51°35'20.130"N, 3°0'0.929"W
51°35'21.12"N, 2°59'58.34"W
Categories:
- British Rail Class 43s of Great Western Railway (First Group)
- British Rail Class 43s in First Group blue livery
- British Rail Class 43s on the South Wales Main Line
- Trains of Great Western Railway (First Group) on the South Wales Main Line
- 2018 in rail transport in Wales
- Electrification of South Wales Main Line
- August 2018 in Newport, Wales
- Rail transport infrastructure in Wales
- British Rail Class 43s at Newport railway station
Hidden categories:
- Information field template with formatting
- Files with coordinates missing SDC location of creation (51° N, 4° W)
- Files with coordinates missing SDC location of creation (51° N, 3° W)
- CC-BY-SA-2.0
- Images from Geograph Britain and Ireland
- Images from Geograph Britain and Ireland missing SDC MIME type
- United Kingdom photographs taken on 2018-08-11
- Pages with maps