File:Madrid Calle 30, una empresa comprometida con la sostenibilidad y el ahorro energético 01.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 575 pixels. Other resolutions: 320 × 230 pixels | 640 × 460 pixels | 1,024 × 736 pixels | 1,280 × 920 pixels | 2,560 × 1,840 pixels | 6,232 × 4,480 pixels.
Original file (6,232 × 4,480 pixels, file size: 1.9 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionMadrid Calle 30, una empresa comprometida con la sostenibilidad y el ahorro energético 01.jpg |
Español: El último Consejo de Administración de Madrid Calle 30 de 2018 ha licitado el nuevo contrato de suministro de alta y baja tensión, que presenta una novedad clave para la sostenibilidad de la ciudad y su transición energética: la exigencia de que la electricidad suministrada proceda de energías 100% renovables. Madrid Calle 30 se suma así a los criterios impulsados por el Ayuntamiento de la ciudad para contratar energía limpia y a las directrices incorporadas en el Plan A de Calidad del Aire. |
Date | |
Source | Diario de Madrid - Madrid Calle 30, una empresa comprometida con la sostenibilidad y el ahorro energético |
Author | Diario de Madrid |
Licensing
[edit]
This file was produced by Ayuntamiento of Madrid, the City Council of Madrid, and provided through Diario de Madrid.
Diario de Madrid website states(archived version): "Salvo excepciones indicadas expresamente, los contenidos de la web diario.madrid.es se publican bajo licencia Creative Commons CC BY 4.0." (English translation: Unless specified otherwise, the contents of diario.madrid.es website are published under the Creative Commons Attribution 4.0 License.) |
To the uploader: Verify whether the file, although created by Ayuntamiento of Madrid, it is actually a derivative work of images by other entities.
|
This file is licensed under the Creative Commons Attribution 4.0 International license.
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:46, 17 February 2019 | 6,232 × 4,480 (1.9 MB) | Discasto (talk | contribs) | =={{int:filedesc}}== {{Information |description={{es|1=El último Consejo de Administración de Madrid Calle 30 de 2018 ha licitado el nuevo contrato de suministro de alta y baja tensión, que presenta una novedad clave para la sostenibilidad de la ciudad y su transición energética: la exigencia de que la electricidad suministrada proceda de energías 100% renovables. Madrid Calle 30 se suma así a los criterios impulsados por el Ayuntamiento de la ciudad para contratar energía limpia y a las dire... |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.