File:Building site with entrance and access signage.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,048 × 1,536 pixels.
Original file (2,048 × 1,536 pixels, file size: 1.31 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary[edit]
DescriptionBuilding site with entrance and access signage.jpg |
British English: Mossford Mews is the name given to six new residential houses being developed in the East London, Borough of Redbridge. Has been built opposite the existing estate Mossford Court properties 25-48. Construction began on January 9th, 2023 as part of Redbridge Affordable Housing Programme and is expected to be completed by April 2024. More Information: link
English: Mossford Mews is the name given to six new residential houses being developed in the East London, Borough of Redbridge. Has been built opposite the existing estate Mossford Court properties 25-48. Construction began on January 9th, 2023 as part of Redbridge Affordable Housing Program and is expected to be completed by April 2024.
Español: Mossford Mews es el nombre dado a seis nuevas casas residenciales que se están desarrollando en el este de Londres, Borough of Redbridge. Se ha construido frente la urbanización existente de Mossford Court 25-48. La construcción comenzó el 9 de enero de 2023 como parte del Programa de Vivienda Asequible de Redbridge y se espera que sea completa en abril de 2024.
Italiano: Mossford Mews è il nome dato a sei nuove case residenziali in fase di sviluppo nell'est di Londra, Borough of Redbridge. È stato costruito di fronte alla tenuta esistente Mossford Court proprietà 25-48. La costruzione è iniziata il 9 gennaio 2023 come parte del Programma di Alloggi a Prezzi Accessibili Redbridge e dovrebbe essere completata entro aprile 2024.
Português: Mossford Mews é o nome dado a seis novas casas residenciais que estão sendo desenvolvidas no leste de Londres, Borough of Redbridge. Foi construído em frente à propriedade existente Mossford Court propriedades 25-48. A construção começou em 9 de janeiro de 2023 como parte do Programa de Habitação Acessível de Redbridge e deve ser concluída até abril de 2024.
Português: Mossford Mews é o nome dado a seis novas casas residenciais que estão sendo desenvolvidas no leste de Londres, Borough of Redbridge. Foi construído em frente à propriedade existente Mossford Court propriedades 25-48. A construção começou em 9 de janeiro de 2023 como parte do Programa de Habitação Acessível de Redbridge e espera-se que seja concluída até abril de 2024. |
Date | |
Source | Own work |
Author | Openwebsource |
Camera location | 51° 35′ 27.96″ N, 0° 04′ 26.4″ E | View this and other nearby images on: OpenStreetMap | 51.591100; 0.074000 |
---|
Licensing[edit]
I, the copyright holder of this work, hereby publish it under the following license:
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 23:15, 28 August 2023 | 2,048 × 1,536 (1.31 MB) | Openwebsource (talk | contribs) | Uploaded own work with UploadWizard |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title |
|
---|---|
Camera manufacturer | SONY |
Camera model | IMX603 |
Author | Openwebmapper |
Exposure time | 1/1,140 sec (0.00087719298245614) |
F-number | f/1.6 |
ISO speed rating | 50 |
Date and time of data generation | 13:35, 22 May 2023 |
Lens focal length | 5.1 mm |
Short title |
|
Orientation | Normal |
Horizontal resolution | 72 dpi |
Vertical resolution | 72 dpi |
Software used | 16.3 |
File change date and time | 13:35, 22 May 2023 |
Y and C positioning | Centered |
Exposure Program | Normal program |
Exif version | 2.32 |
Date and time of digitizing | 13:35, 22 May 2023 |
Meaning of each component |
|
APEX shutter speed | 10.155135538423 |
APEX aperture | 1.3561438092556 |
APEX brightness | 8.2011912812776 |
APEX exposure bias | 0 |
Metering mode | Pattern |
Flash | Flash did not fire, compulsory flash suppression |
DateTimeOriginal subseconds | 362 |
DateTimeDigitized subseconds | 362 |
Supported Flashpix version | 1 |
Color space | Uncalibrated |
Sensing method | One-chip color area sensor |
Scene type | A directly photographed image |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Focal length in 35 mm film | 26 mm |
Scene capture type | Standard |
Keywords |
|