File:Annual report 1919 (1919) (14782315894).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,896 × 1,768 pixels, file size: 2.73 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English:

Identifier: annualreport1919v1onta (find matches)
Title: Annual report 1919
Year: 1919 (1910s)
Authors: Ontario Hydro Hydro-Electric Power Commission of Ontario Ontario Hydro International Inc
Subjects:
Publisher:
Contributing Library: Robarts - University of Toronto
Digitizing Sponsor: University of Guelph, University of Windsor, York University and University of Toronto Libraries

View Book Page: Book Viewer
About This Book: Catalog Entry
View All Images: All Images From Book
Click here to view book online to see this illustration in context in a browseable online version of this book.

Text Appearing Before Image:
mpleted and put into service on January 8, 1919. Plans are being prepared for the installation of a bank of three 75-kv-a.,12,000/575-volt transformers, which will be used as reserves for station service. Switching Equipment, 12,000 Volts The rebuilding of the 12,000-volt auxiliary bus structure complete withswitching equipment for No. 1 Ontario Power Companys feeder and No. 1 bank of110,000-volt transformers, which was mentioned in last years Eeport, was com-pleted and put into service on December 27, 1918. The 12,000-volt auxiliary bus structure and equipment for No. 2 and No. 3banks of 110,000-volt transformers and for No. 2 and No 3 Ontario Power Companyfeeders, which was installed in the original installation, has been completely takenout and new bus structures have been built. New bus and switching equipmentof the latest improved type has been installed on these structures. No. 2 structurewas put into service May 28, 1919, and No. 3 structure was put into serviceOctober 7, 1919.
Text Appearing After Image:
180000 160000 140000 120000 100000 80000 60000 40000 20000 ;l^4illf Ittlsi^42lSf jLt«fg;j^ii;titIt5l^^giIfttfSgi2ASItS4Sttg4^t«iif i«tiSi^ASiSHatf5l5^iSlfItIfgl^iSiItlt^fg 1920 HYDRO-ELECTRIC POWER COMMISSION 179 Switching Equipment, 110,000 Volts The 110,000-volt oil circuit-breakers for the four lines to Dundas, which worementioned in last years Report, were all installed and put into service duringthe first half of this year. 12,000 Volt Feeders No. 1 feeder from the Ontario Power Company, which consists of four350,000-c.m., three-conductor, paper-insulated, lead-covered, armored cables wasinstalled during the latter part of 1918, and put into service on December 27, 1918. Protection of Service The neutral resistances for the 110,000-volt and 46,000-volt outgoing lineswere completed and put into service in November, 1918. These have been enclosedby a temporary wooden building. These neutral resistances have to date provedentirely satisfactory. The new storage battery has been in

Note About Images

Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.
Date
Source

https://www.flickr.com/photos/internetarchivebookimages/14782315894/

Author

Ontario Hydro; Hydro-Electric Power Commission of Ontario;

Ontario Hydro International Inc
Permission
(Reusing this file)
At the time of upload, the image license was automatically confirmed using the Flickr API. For more information see Flickr API detail.
Volume
InfoField
1
Flickr tags
InfoField
Flickr posted date
InfoField
30 July 2014



Licensing

[edit]
This image was taken from Flickr's The Commons. The uploading organization may have various reasons for determining that no known copyright restrictions exist, such as:
  1. The copyright is in the public domain because it has expired;
  2. The copyright was injected into the public domain for other reasons, such as failure to adhere to required formalities or conditions;
  3. The institution owns the copyright but is not interested in exercising control; or
  4. The institution has legal rights sufficient to authorize others to use the work without restrictions.

More information can be found at https://flickr.com/commons/usage/.


Please add additional copyright tags to this image if more specific information about copyright status can be determined. See Commons:Licensing for more information.
This image was originally posted to Flickr by Internet Archive Book Images at https://flickr.com/photos/126377022@N07/14782315894. It was reviewed on 19 August 2015 by FlickreviewR and was confirmed to be licensed under the terms of the No known copyright restrictions.

19 August 2015

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:34, 19 August 2015Thumbnail for version as of 01:34, 19 August 20154,896 × 1,768 (2.73 MB) (talk | contribs)== {{int:filedesc}} == {{information |description={{en|1=<br> '''Identifier''': annualreport1919v1onta ([https://commons.wikimedia.org/w/index.php?title=Special%3ASearch&profile=default&fulltext=Search&search=insource%3A%2Fannualreport1919v1onta%2F fin...

There are no pages that use this file.