File:2010 07 20590 6662 Da'an District, Taipei, Xinyi Road, Taipei Metro Xinyi Line, Tunnel construction, Bottom-up method, Slurry wall, Taiwan.JPG
Jump to navigation
Jump to search
Size of this preview: 800 × 533 pixels. Other resolutions: 320 × 213 pixels | 640 × 427 pixels | 1,024 × 682 pixels | 1,280 × 853 pixels | 2,560 × 1,706 pixels | 4,155 × 2,769 pixels.
Original file (4,155 × 2,769 pixels, file size: 3.86 MB, MIME type: image/jpeg)