File:Wind turbine getting ready to transport.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (1,280 × 856 pixels, file size: 122 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description

The first wind farm that the Zero Emission Resource Organisation worked for are now in the process of beeing realized.

The first blades arrived at the docks of Egersund and are now transported to Høg-Jæren energypark in Rogaland.

Each blade is 45 meters long and the wind mills will be approximately 80 meters tall.

The wind farm will produce 230 GWh a year.

Photo: Lars Helge Helvig.
Date
Source

Wind turbine getting ready to transport

Author Zero Emission Resource Organisation
Camera location58° 27′ 03.48″ N, 5° 59′ 41.13″ E Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image, originally posted to Flickr, was reviewed on March 26, 2011 by the administrator or reviewer File Upload Bot (Magnus Manske), who confirmed that it was available on Flickr under the stated license on that date.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:47, 26 March 2011Thumbnail for version as of 08:47, 26 March 20111,280 × 856 (122 KB)File Upload Bot (Magnus Manske) (talk | contribs){{Information |Description=The first wind farm that the Zero Emission Resource Organisation worked for are now in the process of beeing realized. The first blades arrived at the docks of Egersund and are now transported to Høg-Jæren energypark in Roga

There are no pages that use this file.

Metadata