File:US 4636 in 2023 pulling cars.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,000 × 934 pixels, file size: 598 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Army locomotives at Fort McCoy key to success of first rail movement at installation in 2023 Members of the Fort McCoy rail operations team operate an Army locomotive May 19, 2023, for a rail movement at Fort McCoy, Wis. Fort McCoy is one of a small number of Army installations where Army locomotives are present. For the many decades of Fort McCoy’s existence, the capability to transport cargo and equipment to and from the installation by rail has always been there. During World War II, for example, the railroad at Fort McCoy was one of the main forms of transportation for bringing troops in for training and home after the war as well as moving cargo and equipment in and out of the installation. And as rail operations continue in the future at the installation, officials with the Fort McCoy Logistics Readiness Center that manages Fort McCoy rail operations say they welcome each and every opportunity to demonstrate the capability. They said rail is one of the post's strategic transportation missions, and regular rail movements allow the installation to exercise that capability. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.) (Scott Sturkol)
Date May 2023
Source https://www.army.mil/article/267296/army_locomotive_at_fort_mccoy_key_to_success_of_first_rail_movement_at_installation_in_2023
Author (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.) (Scott Sturkol)

Licensing

[edit]
Public domain
This file is a work of a U.S. Army soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

العربية  বাংলা  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  hrvatski  magyar  Bahasa Indonesia  italiano  日本語  한국어  lietuvių  македонски  മലയാളം  မြန်မာဘာသာ  Nederlands  polski  português  русский  sicilianu  српски / srpski  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current02:07, 31 October 2023Thumbnail for version as of 02:07, 31 October 20232,000 × 934 (598 KB)Oaktree b (talk | contribs)Uploaded a work by (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.) (Scott Sturkol) from https://www.army.mil/article/267296/army_locomotive_at_fort_mccoy_key_to_success_of_first_rail_movement_at_installation_in_2023 with UploadWizard

The following page uses this file:

Metadata