File:USS John F. Kennedy (CVN-79) in drydock at Newport News Shipbuilding, Virginia (USA) on 29 October 2019 (191029-N-BD319-110).JPG
Original file (6,000 × 4,000 pixels, file size: 1.78 MB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionUSS John F. Kennedy (CVN-79) in drydock at Newport News Shipbuilding, Virginia (USA) on 29 October 2019 (191029-N-BD319-110).JPG |
English: The U.S. Navy aircraft carrier USS John F. Kennedy (CVN-79) reached another construction milestone on 29 October 2019, as its dry dock area was flooded three months ahead of its slated production schedule, leading up to the christening of the second Ford-class aircraft carrier on 7 December 2019. The flooding of the dry dock followed other milestones, including the laying of the ship's keel on 22 August 2015, the placement of the 588-metric ton island superstructure on 29 May 2019, and the arrival of her crew on 1 October 2019. John F. Kennedy was constructed at Huntington Ingalls Industries-Newport News Shipbuilding, Newport News, Virginia (USA). |
|||
Date | Taken on 29 October 2019 | |||
Source |
|
|||
Author | U.S. Navy photo by Mass Communication Specialist 3rd Class Adam Ferrero |
Licensing
[edit]Public domainPublic domainfalsefalse |
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.
|
||
This file has been identified as being free of known restrictions under copyright law, including all related and neighboring rights. |
https://creativecommons.org/publicdomain/mark/1.0/PDMCreative Commons Public Domain Mark 1.0falsefalse
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:47, 29 October 2019 | 6,000 × 4,000 (1.78 MB) | Cobatfor (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=The U.S. Navy aircraft carrier USS ''John F. Kennedy'' (CVN-79) reached another construction milestoneon 29 October 2019, as its dry dock area was flooded three months ahead of its slated production schedule leading up to the christening of the second ''Ford''-class aircraft carrier, scheduled for 7 December 2019. The flooding of the dry dock followed other milestones, including the laying of the ship's keel on 22 August 2015, the place... |
You cannot overwrite this file.
File usage on Commons
The following 3 pages use this file:
File usage on other wikis
The following other wikis use this file:
- Usage on af.wikipedia.org
- Usage on ar.wikipedia.org
- Usage on cs.wikipedia.org
- Usage on de.wikipedia.org
- Usage on en.wikipedia.org
- Usage on es.wikipedia.org
- Usage on fi.wikipedia.org
- Usage on fr.wikipedia.org
- Usage on ja.wikipedia.org
- Usage on ko.wikipedia.org
- Usage on no.wikipedia.org
- Usage on pl.wikipedia.org
- Usage on pt.wikipedia.org
- Usage on sv.wikipedia.org
- Usage on th.wikipedia.org
- Usage on tr.wikipedia.org
- Usage on uk.wikipedia.org
- Usage on vi.wikipedia.org
- Usage on www.wikidata.org
- Usage on zh.wikipedia.org
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | NIKON CORPORATION |
---|---|
Camera model | NIKON D7200 |
Author | MC3 Adam Ferrero |
Exposure time | 1/160 sec (0.00625) |
F-number | f/10 |
ISO speed rating | 500 |
Date and time of data generation | 09:28, 29 October 2019 |
Lens focal length | 24 mm |
City shown | NEWPORT NEWS |
Short title | 191029-N-BD319-110 |
Credit/Provider | U.S. Navy |
Source | Navy Office of Information |
Image title | 191029-N-BD319-110 NEWPORT NEWS, Va. (Oct. 29, 2019) The aircraft carrier Pre-Commissioning Unit (PCU) John F. Kennedy (CVN 79) reaches another construction milestone, Oct. 29, 2019, as its dry dock area is flooded three months ahead of its slated production schedule leading up to the christening of the second Ford-class aircraft carrier, scheduled for Dec. 7, 2019. The flooding of the dry dock follows other milestones, including the laying of the ship’s keel on Aug. 22, 2015, the placement of the 588-metric ton island superstructure on May 29, 2019, and the arrival of the crew on Oct. 1, 2019. Kennedy is currently under construction at Huntington Ingalls Industries-Newport News Shipbuilding. (U.S. Navy photo by Mass Communication Specialist 3rd Class Adam Ferrero/Released) |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | Adobe Photoshop Camera Raw 10.3 (Macintosh) |
File change date and time | 2019-10-29 |
Exposure Program | Manual |
Exif version | 2.3 |
Date and time of digitizing | 09:28, 29 October 2019 |
APEX shutter speed | 7.321928 |
APEX aperture | 6.643856 |
APEX exposure bias | 0 |
Maximum land aperture | 3 APEX (f/2.83) |
Metering mode | Pattern |
Light source | Unknown |
Flash | Flash did not fire, compulsory flash suppression |
DateTimeOriginal subseconds | 79 |
DateTimeDigitized subseconds | 79 |
Color space | Uncalibrated |
Focal plane X resolution | 2,558.641204834 |
Focal plane Y resolution | 2,558.641204834 |
Focal plane resolution unit | 3 |
Sensing method | One-chip color area sensor |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Manual exposure |
White balance | Manual white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 36 mm |
Scene capture type | Standard |
Scene control | Low gain up |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Unknown |
IIM version | 3 |
Province or state shown | Va. |
Country shown | United States |
Category | N |
Supplemental categories |
|
Keywords |
|
Writer |
|
Special instructions | Released/Distributed by the Navy Office of Information (CHINFO) navymedia@navy.mil (703) 614-9154 www.navy.mil |
Original transmission location code | PCU John F. Kennedy (CVN 79) |
Rating (out of 5) | 0 |