File:USMC-120312-M-UP717-040.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (2,592 × 3,888 pixels, file size: 5.99 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents
Description
English: Two methane-powered generators were built for the 3 megawatt-hours of energy power-purchase project between the Miramar Landfill and Marine Corps Air Station Miramar that is set for completion in May. Each generator is capable of producing 1900 kW of energy from methane-collection throughout the Miramar Landfill. After the gas is sent to the generator, it will then run through approximately a mile and a half of above-ground power lines and two miles of below-ground lines to MCAS Miramar.
Date Taken on 12 March 2012
Source

This image was released by the United States Marine Corps with the ID 120312-M-UP717-040 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author
Permission
(Reusing this file)
Public domain
This file is a work of a United States Marine or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain.

العربية  বাংলা  català  Deutsch  English  español  français  magyar  italiano  日本語  македонски  മലയാളം  မြန်မာဘာသာ  Nederlands  português  русский  sicilianu  slovenščina  svenska  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:42, 7 December 2012Thumbnail for version as of 08:42, 7 December 20122,592 × 3,888 (5.99 MB)Slick-o-bot (talk | contribs){{Information |Description={{en|1=Two methane-powered generators were built for the 3 megawatt-hours of energy power-purchase project between the Miramar Landfill and Marine Corps Air Station Miramar that is set for completion in May. Each generator is...

There are no pages that use this file.

Metadata